[论文解读] Digitalization in Infrastructure Construction Projects: A PRISMA-Based Review of Benefits and Obstacles

Mohammed Abdulsalam Alsofiani|arXiv (Cornell University)|May 27, 2024
BIM and Construction IntegrationEngineering被引用 5
一句话总结

本论文提供基于 PRISMA 的 BIM 在基础设施项目中的采用综述(2013–2023),详细列出在项目生命周期中的收益,并识别出74个障碍,聚类为七大障碍。

ABSTRACT

The current study presents a comprehensive review of the benefits and barriers associated with the adoption of Building Information Modeling (BIM) in infrastructure projects, focusing on the period from 2013 to 2023. The research explores the manifold advantages offered by BIM, spanning the entire project life cycle, including planning, design, construction, maintenance, and sustainability. Notably, BIM enhances collaboration, facilitates real-time data-driven decision-making, and leads to substantial cost and time savings. In parallel, a systematic literature review was conducted to identify and categorize the barriers hindering BIM adoption within the infrastructure industry. Eleven studies were selected for in-depth analysis, revealing a total of 74 obstacles. Through synthetic analysis and thematic clustering, seven primary impediments to BIM adoption were identified, encompassing challenges related to education/training, resistance to change, business value clarity, perceived cost, lack of standards and guidelines, lack of mandates, and lack of initiatives. This review explores the benefits and barriers in the industry that are facing BIM adoption in infrastructure projects, giving an important perspective toward improving effective BIM adoption strategies, policies, and standards. Future directions for research and industry development are outlined, including efforts to enhance education and training, promote standardization, advocate for policy and mandates, and integrate BIM with emerging technologies.

研究动机与目标

  • 在基础设施项目全生命周期(规划、设计、施工、维护、可持续性)中识别 BIM 的收益。
  • 识别并分类阻碍基础设施项目 BIM 采用的障碍。
  • 将障碍综合成一个简明框架,以供政策、标准和实践之用。
  • 为教育、标准化、强制执行以及与新兴技术的整合提供方向。

提出的方法

  • 阶段一使用 VOSviewer 可视化 2013–2023 文献中 BIM-收益 关键词之间的关系。
  • 阶段二应用 PRISMA 进行系统综述,以识别基础设施项目中 BIM 采用障碍。
  • 检索数据库:Web of Science 与 Science Direct;关键词仅限于标题/摘要;纳入时间窗为 2015–2023。
  • 采用定性内容分析和归纳编码,从74个障碍中推导出七个主要障碍主题。
  • 用描述文章筛选与排除的 PRISMA 流程图进行验证。

实验结果

研究问题

  • RQ1在整个生命周期中,BIM 对基础设施项目的报道收益有哪些?
  • RQ2阻碍基础设施项目中 BIM 采用的障碍有哪些,如何对其进行分类和解决?

主要发现

  • BIM 提升协作、实时数据驱动的决策,并且可以在规划、设计、施工和维护阶段降低成本和时间。
  • 共识别出74个 BIM 采用障碍并归纳聚类为七个障碍。
  • 七个障碍主题是:教育/培训、对变革的抵触、商业价值不清、感知成本、缺乏标准/指南、缺乏强制性要求、缺乏倡议。
  • 案例研究证据和文献表明,BIM 可以降低变更单、返工和基础设施项目的施工工期。
  • 研究讨论 BIM 与数字孪生、物联网及新兴技术的整合,作为 Construction 4.0 的一部分,并概述未来研究方向。