[论文解读] Linear Accelerator Test Facility at LNF Conceptual Design Report

P. Valente, Franco Sardone|arXiv (Cornell University)|Mar 11, 2016
Particle accelerators and beam dynamicsEngineering被引用 8
一句话总结

本文提出将弗拉斯卡蒂直线加速器测试设施(BTF2/TALYA)的概念性升级,以扩展其能力,超越其当前作为DAΦNE对撞机束流注入器的角色。该项目包括整合直线加速器调制器、将加速器能量从510 MeV提升至1.0 GeV,并将束流线数量翻倍,以支持基础物理实验、电子辐照及工业应用,显著提升束流可用性和实验吞吐量,惠及更广泛的用户群体。

ABSTRACT

Test beam and irradiation facilities are the key enabling infrastructures for research in high energy physics (HEP) and astro-particles. In the last 11 years the Beam-Test Facility (BTF) of the DAΦNE accelerator complex in the Frascati laboratory has gained an important role in the European infrastructures devoted to the development and testing of particle detectors. At the same time the BTF operation has been largely shadowed, in terms of resources, by the running of the DAΦNE electron-positron collider. The present proposal is aimed at improving the present performance of the facility from two different points of view: • Extending the range of application for the LINAC beam extracted to the BTF lines, in particular in the (in some sense opposite) directions of hosting fundamental physics and providing electron irradiation also for industrial users; • Extending the life of the LINAC beyond or independently from its use as injector of the DAΦNE collider, as it is also a key element of the electron/positron beam facility. The main lines of these two developments can be identified as: • Consolidation of the LINAC infrastructure, in order to guarantee a stable operation in the longer term; • Upgrade of the LINAC energy, in order to increase the facility capability (especially for the almost unique extracted positron beam); • Doubling of the BTF beam-lines, in order to cope with the signicant increase of users due to the much wider range of applications. Even though such a project stems from a facility already existing and operational since more than a decade, based on an accelerator complex designed more than 20 years ago, it is probably useful considering the resulting infrastructure as a new facility, more than an improvement of the existing DAΦNE BTF: BTF2 or TALYA, Linear Accelerator Test fAcilitY are the suggested names (Fig. 0.1).

研究动机与目标

  • 将现有的弗拉斯卡蒂束流测试设施(BTF)改造为独立于DAΦNE对撞机运行的专用、高容量直线加速器测试设施(BTF2/TALYA)。
  • 通过升级调制器和射频系统,延长直线加速器的运行寿命并提升长期稳定性和可靠性。
  • 将直线加速器能量从510 MeV提升至1.0 GeV,以支持新型物理实验和更高强度的束流输送。
  • 将BTF的束流线数量翻倍,以满足基础物理和工业用户日益增长的需求。
  • 支持多样化应用,包括标记光子源、中子生成、电子辐照,以及精密实验如PADME和通道效应研究。

提出的方法

  • 在机器停机期间,分三年阶段实施,整合直线加速器调制器和联锁系统。
  • 安装四个新的3米S波段加速腔以及第五个射频站(含速调管、SLED和脉冲变压器),以提高直线加速器能量。
  • 重新设计BTF束流线,将两个FODO双极磁铁组替换为三极四极磁铁组,并将第一个分束二极磁铁移近实验大厅。
  • 建立新的波导网络,并扩展辅助系统(真空、冷却、控制)以支持升级后的直线加速器和新束流线。
  • 利用QW型四极磁铁和传输模型进行束流动力学仿真与光学验证,确保系统稳定性和束流发射度控制。
  • 在计划的DAΦNE停机期间分阶段进行新组件的调试,以最小化对现有运行的干扰。

实验结果

研究问题

  • RQ1如何升级劳伦斯弗拉斯卡蒂国家实验室(LNF)现有的直线加速器基础设施,以支持更高能量和更长期稳定运行,超越其作为DAΦNE注入器的当前角色?
  • RQ2何种技术和后勤方案可实现BTF束流线安全高效地翻倍,同时保持束流质量与屏蔽合规性?
  • RQ3在保持束流动力学稳定并最小化对现有运行干扰的前提下,将直线加速器扩展至1.0 GeV的最优配置是什么?
  • RQ4如何重新配置设施以支持新应用,如标记光子源、中子生成以及面向工业用户的电子辐照?
  • RQ5完成升级所需的预计时间表和资源分配是什么?如何在最小化对现有对撞机和束流测试运行干扰的前提下推进?

主要发现

  • 通过安装四个新加速腔和第五个射频站,预计直线加速器能量将从510 MeV提升至1.0 GeV。
  • 束流线升级将通过将第一个分束二极磁铁移近实验大厅,并将FODO双极磁铁组替换为三极四极磁铁组,实现束流线数量翻倍。
  • 该项目计划为期三年,安装与调试工作将分阶段安排在DAΦNE的夏季和圣诞节年度停机期间,以最小化运行干扰。
  • 总人力需求估计约为100人·月,峰值工作量不超过每人30%的全职等效工作量。
  • 此次升级将支持新应用,包括PADME实验(正电子-电子湮灭以研究暗光子)、通道效应实验,以及面向工业用户的电子辐照。
  • 该设施拟作为新实体(BTF2或TALYA)独立运作,强调其从寄生式束流测试设施向专用、高性能直线加速器测试设施的转型。