Skip to main content
QUICK REVIEW

[论文解读] Multi-Agent Monte Carlo Tree Search for Makespan-Efficient Object Rearrangement in Cluttered Spaces

Hanwen Ren, Junyong Kim|arXiv (Cornell University)|Feb 2, 2026
Advanced Manufacturing and Logistics OptimizationEngineering被引用 0
一句话总结

CAM-MCTS 引入集中化任务分配与异步执行以解决混乱环境中的单调与非单调对象重排任务,相比基线在完成时间和扩展性方面表现更优。它使用带一步前瞻的集中化 MCTS 与异步执行策略。

ABSTRACT

Object rearrangement planning in complex, cluttered environments is a common challenge in warehouses, households, and rescue sites. Prior studies largely address monotone instances, whereas real-world tasks are often non-monotone-objects block one another and must be temporarily relocated to intermediate positions before reaching their final goals. In such settings, effective multi-agent collaboration can substantially reduce the time required to complete tasks. This paper introduces Centralized, Asynchronous, Multi-agent Monte Carlo Tree Search (CAM-MCTS), a novel framework for general-purpose makespan-efficient object rearrangement planning in challenging environments. CAM-MCTS combines centralized task assignment-where agents remain aware of each other's intended actions to facilitate globally optimized planning-with an asynchronous task execution strategy that enables agents to take on new tasks at appropriate time steps, rather than waiting for others, guided by a one-step look-ahead cost estimate. This design minimizes idle time, prevents unnecessary synchronization delays, and enhances overall system efficiency. We evaluate CAM-MCTS across a diverse set of monotone and non-monotone tasks in cluttered environments, demonstrating consistent reductions in makespan compared to strong baselines. Finally, we validate our approach on a real-world multi-agent system under different configurations, further confirming its effectiveness and robustness.

研究动机与目标

  • 在混乱且非单调的环境中,激励并解决对象重排规划问题。
  • 开发一个集中化、异步化的多智能体规划框架,使用蒙特卡洛树搜索(CAM-MCTS)。
  • 实现异步任务执行以减少空闲时间并提升完成时间表现。
  • 提供一个集中化的任务分配模块,以削减搜索空间并引导规划。
  • 通过仿真和真实机器人实验验证该方法,在基线之上展示改进性能。

提出的方法

  • 将问题建模为对对象与智能体的联合状态的集中化 MCTS。
  • 定义一个考虑成本的 UCB 选择准则,平衡总移动距离与完成时间。
  • 采用集中化任务分配生成多条候选任务计划以供空闲/活跃智能体使用。
  • 引入带一步前瞻的异步任务执行机制,在有利时终止迭代。
  • 使用 ICBS 生成初始同步路径,然后根据估计完成时间将其切分为异步路径。
  • 支持在混乱环境中的单调和非单调重排。
Figure 2 : The figure illustrates the asynchronous task execution design for agent A1 to A4. Starting from the synchronous task execution (a), our method leverges the cost estimation with one-step look-ahead (b) to find the most appropriate time step $t^{\prime}_{a}$ (c) to terminate the current ite
Figure 2 : The figure illustrates the asynchronous task execution design for agent A1 to A4. Starting from the synchronous task execution (a), our method leverges the cost estimation with one-step look-ahead (b) to find the most appropriate time step $t^{\prime}_{a}$ (c) to terminate the current ite

实验结果

研究问题

  • RQ1集中化、异步化的 MCTS 规划是否能降低混乱空间中多智能体对象重排的完成时间?
  • RQ2一步前瞻的时序对异步任务执行和整体规划效率有何影响?
  • RQ3与基线相比,CAM-MCTS 在单调与非单调重排任务上的表现如何?
  • RQ4集中化任务分配对搜索空间与解质量的影响如何?
  • RQ5仿真结果是否与在多样化环境中的真实机器人实验一致?

主要发现

  • 在对象/智能体组合数从6到10的渐进难度下,CAM-MCTS的成功率和完成时间均优于基线。
  • 带一步前瞻的异步任务执行相较于同步变体,能显著降低空闲时间与完成时间。
  • 集中化任务分配能生成多条高质量候选方案,相比随机或单一方案提升了解的质量。
  • CAM-UCS 在较大问题上的规划时间与可扩展性较差,RSP 尽管快速但完成时间较差。
  • 两台 TurtleBot3 的真实机器人实验显示规划约0.45 s、执行约383 s 的平均值,验证了实际可行性。
(a) narrow passage
(a) narrow passage

阅读本论文

在 Nubint 阅读器中打开原文,边读边就任意段落提问。

在 Nubint 中阅读本论文

本解读由 AI 根据论文原文生成,引用前请核对原文。