[论文解读] Parameterized Complexity of Scheduling Problems in Robotic Process Automation
论文分析具有先行、释放时间与截止时间的单机器排程问题在参数化复杂性下的边界,基于实际的RPA参数识别困难边界与可处理情况。给出W[2]-hardness结果,以及针对选定参数域的FPT与XP算法。
This paper studies the growing domain of Robotic Process Automation (RPA) problems. Motivated by scheduling problems arising in RPA, we study the parameterized complexity of the single-machine problem $1| ext{prec},r_j,d_j|*$. We focus on parameters naturally linked to RPA systems, including chain-like precedences, the number of distinct processing times, and the structure of the time windows. We show that the problem is W[2]-hard parameterized by the number of chains, even with only two prescribed processing times and two distinct time-window lengths. This hardness remains even for distinct processing times and time windows under prec-consistent time windows. On the positive side, we obtain polynomial-time algorithm when all jobs share a single time-window length and FPT when the processing times, release times and deadlines are chain-uniform. We also show that the problem lies in XP when parameterized by the width of the precedence relation.
研究动机与目标
- Motivate scheduling challenges in Robotic Process Automation (RPA) and formalize them within a parameterized complexity framework.
- Study the single-machine problem 1|prec,r_j,d_j|* under RP A-inspired parameters.
- Determine hardness and tractability boundaries for natural RP A parameters such as chain counts, processing-time variety, and time-window structure.
- Provide algorithmic results (FPT and XP) for specific parameter combinations and discuss implications for RPA scheduling.
提出的方法
- Model the RPA scheduling problem as 1|prec,r_j,d_j|* with chain-like precedences and RP A-inspired parameters.
- Prove W[2]-hardness when parameterized by the number of chains, even with limited processing-time and time-window diversity.
- Refine reductions to show para-NP-hardness for combined parameters (#p_j + p_max + #(d_j-r_j)).
- Identify tractable cases: polynomial time when all jobs share a single time-window length, and FPT when processing times, release times, and deadlines are chain-uniform.
- Show XP membership when parameterized by the width of the precedence relation.
- Relate findings to existing parameterized scheduling results and RP A scheduling needs.
实验结果
研究问题
- RQ1Does the single-machine scheduling problem with precedences, release times, and deadlines remain hard when chain-like precedences are present and the number of chains is the parameter?
- RQ2What RP A-inspired parameters yield tractable (polynomial or FPT) algorithms for 1|prec,r_j,d_j|*?
- RQ3Are there natural RP A scenarios where the problem is solvable in polynomial time or FPT despite precedence constraints?
- RQ4Is the problem contained in XP when parameterized by the width of the precedence relation?
- RQ5How do results compare with known parameterized scheduling results under related parameters such as slack, window sizes, and chain-uniformity?
主要发现
- The problem is W[2]-hard parameterized by the number of chains, even with only two processing times and two distinct time windows.
- The hardness persists for prec-consistent time windows and remains para-NP-hard for combined parameters (#p_j + p_max + #(d_j-r_j)).
- There is a polynomial-time algorithm when all jobs share a single time-window length.
- The problem is FPT when release times, deadlines, and processing times are chain-uniform.
- The problem is in XP when parameterized by the width of the precedence relation.
- These results map practical RPA scheduling constraints to precise parameterized complexity classes.
阅读本论文
在 Nubint 阅读器中打开原文,边读边就任意段落提问。
在 Nubint 中阅读本论文本解读由 AI 根据论文原文生成,引用前请核对原文。