[论文解读] PowerPM: Foundation Model for Power Systems
PowerPM 是一种用于电力系统的基础模型,采用双编码器架构,其中时间编码器用于建模序列动态,层次编码器用于捕捉多粒度依赖关系,通过掩码 ETS 建模和双视角对比学习进行预训练。该模型在私有和公共数据集上的多种下游任务中均实现了最先进性能,展现出强大的泛化能力和少样本适应能力。
The emergence of abundant electricity time series (ETS) data provides ample opportunities for various applications in the power systems, including demand-side management, grid stability, and consumer behavior analysis. Deep learning models have advanced ETS modeling by effectively capturing sequence dependence. Nevertheless, learning a generic representation of ETS data for various applications remains challenging due to the inherently complex hierarchical structure of ETS data. Moreover, ETS data exhibits intricate temporal dependencies and is suscepti ble to the influence of exogenous variables. Furthermore, different instances exhibit diverse electricity consumption behavior. In this paper, we propose a foundation model PowerPM to model ETS data, providing a large-scale, off-the-shelf model for power systems. PowerPM consists of a temporal encoder and a hierarchical encoder. The temporal encoder captures both temporal dependencies in ETS data, considering exogenous variables. The hierarchical encoder models the correlation between hierarchy. Furthermore, PowerPM leverages a novel self-supervised pretraining framework consisting of masked ETS modeling and dual-view contrastive learning, which enable PowerPM to capture temporal dependency within ETS windows and aware the discrepancy across ETS windows, providing two different perspectives to learn generic representation. Our experiments involve five real world scenario datasets, comprising private and public data. Through pre-training on massive ETS data, PowerPM achieves SOTA performance on diverse downstream tasks within the private dataset. Impressively, when transferred to the public datasets, PowerPM maintains its superiority, showcasing its remarkable generalization ability across various tasks and domains. Moreover, ablation studies, few-shot experiments provide additional evidence of the effectiveness of our model.
研究动机与目标
- 为解决建模具有多样化用电行为和时间依赖关系的复杂分层电力系统时间序列(ETS)数据的挑战。
- 开发一种通用的、即插即用的电力系统基础模型,即使在标注数据有限的情况下,也能在多种下游任务中实现良好泛化。
- 克服现有预训练方法使用小规模数据且缺乏面向电力系统领域特定设计的局限性。
- 在保留层次结构的前提下,将外生变量(如天气、季节性)整合到时间建模中。
- 通过自监督预训练,实现在私有和公共数据集之间强大的少样本性能与迁移学习能力。
提出的方法
- PowerPM 采用双编码器架构:时间编码器用于建模窗口内依赖关系及外生变量,层次编码器用于捕捉不同粒度层级间(如城市 → 区域 → 用户)的相关性。
- 采用一种新颖的自监督预训练框架,结合掩码 ETS 建模与双视角对比学习,从大规模 ETS 数据中学习通用表征。
- 掩码 ETS 建模通过重建受损的时间序列窗口,增强对单个实例内时间依赖关系的学习。
- 双视角对比学习通过对齐来自不同视角的表征——局部(窗口内)与全局(跨窗口)——提升对实例间差异的鲁棒性。
- 模型在大规模私有 ETS 数据上进行预训练,随后在下游任务(如预测、填补、异常检测和分类)上进行微调。
- 该架构支持迁移学习,使模型在无需任务特定微调的情况下,即可在公共数据集上实现强大的少样本性能。

实验结果
研究问题
- RQ1基础模型能否有效捕捉电力系统时间序列数据中的窗口内时间依赖关系与层级间层次相关性?
- RQ2结合掩码 ETS 建模与双视角对比学习的自监督预训练是否能生成优于现有方法的通用表征?
- RQ3当从私有数据集迁移到公共数据集时,PowerPM 在下游任务上的泛化能力如何?
- RQ4在低数据场景下(少样本学习),PowerPM 的性能保持程度如何?
- RQ5各个组件(时间编码器、层次编码器、预训练目标)对整体性能的贡献程度如何?
主要发现
- 在私有数据集的五个下游任务中,PowerPM 均实现了最先进性能,优于现有模型如 TS2Vec、CoST、PatchTST、UniTime、TimeLLM 和 GPT4TS。
- 在迁移到公共数据集后,PowerPM 仍保持卓越性能,展现出在不同领域和任务间强大的零样本与少样本泛化能力。
- 在少样本学习中,PowerPM 表现最稳定,微调使用 10% 数据时,分类任务的准确率仅下降 9.88%,显著低于基线模型的下降幅度。
- 在填补任务中,PowerPM 实现最低 MSE(在 60% 微调数据下为 0.2717),在 10% 数据下仅下降 16.57%,显著优于次优模型。
- 在预测任务中,PowerPM 实现最低 MSE(在 60% 数据下为 0.3343),在 10% 数据下仅下降 9.25%,全面优于所有基线模型。
- 消融实验确认,掩码 ETS 建模与双视角对比学习均不可或缺,二者对模型鲁棒性与泛化能力均有显著贡献。

阅读本论文
在 Nubint 阅读器中打开原文,边读边就任意段落提问。
在 Nubint 中阅读本论文本解读由 AI 根据论文原文生成,引用前请核对原文。