This paper evaluates quantum annealing (QA) as a potential replacement for CMOS in next-generation (NextG) cellular baseband processing, proposing a hybrid C-RAN architecture where QA handles compute-intensive tasks. It projects that QA with 3.1 million qubits and 102 μs problem latency could match CMOS spectral efficiency while reducing power by 45% (41 kW) in a 64-antenna, 400 MHz 5G base station, achieving a power advantage by ~2035–2038.
In order to meet mobile cellular users' ever-increasing data demands, today's 4G and 5G networks are designed mainly with the goal of maximizing spectral efficiency. While they have made progress in this regard, controlling the carbon footprint and operational costs of such networks remains a long-standing problem among network designers. This paper takes a long view on this problem, envisioning a NextG scenario where the network leverages quantum annealing for cellular baseband processing. We gather and synthesize insights on power consumption, computational throughput and latency, spectral efficiency, operational cost, and feasibility timelines surrounding quantum technology. Armed with these data, we analyze and project the quantitative performance targets future quantum annealing hardware must meet in order to provide a computational and power advantage over CMOS hardware, while matching its whole-network spectral efficiency. Our quantitative analysis predicts that with quantum annealing hardware operating at a 102 $μ$s problem latency and 3.1M qubits, quantum annealing will achieve a spectral efficiency equal to CMOS computation while reducing power consumption by 41 kW (45% lower) in a representative 5G base station scenario with 400 MHz bandwidth and 64 antennas, and an 8 kW power reduction (16% lower) using 1.5M qubits in a 200 MHz-bandwidth 5G scenario.
Motivation & Objective
- To assess the long-term feasibility of quantum annealing (QA) for baseband processing in NextG cellular networks.
- To compare QA and CMOS in terms of power consumption, computational throughput, latency, spectral efficiency, and operational cost.
- To project the quantum hardware specifications (qubit count, latency) required for QA to achieve a power and cost advantage over CMOS in 5G base stations.
- To estimate the timeline for QA to become operationally viable and economically beneficial in real-world RAN deployments.
Proposed method
- The study models a hybrid C-RAN architecture where QA units handle baseband processing and CMOS manages control plane functions.
- It derives power and latency requirements for QA to match CMOS spectral efficiency in 5G base stations with varying bandwidth and antenna counts (e.g., 64–128 antennas, 200–400 MHz).
- The authors use extrapolated historical QA qubit growth trends (2011–2023) to project future qubit availability and map these to feasibility timelines.
- They compute power savings by comparing QA’s projected power draw to CMOS at 14 nm and 1.5 nm process nodes, assuming constant spectral efficiency.
- Economic feasibility is assessed by comparing QA’s capital expenditure (CapEx) to operational expenditure (OpEx) savings from reduced power consumption.
- CO₂ emissions are estimated using a standard emission factor of 0.92 lbs CO₂ per kWh to quantify environmental impact.
Experimental results
Research questions
- RQ1What qubit count and problem latency are required for quantum annealing to match CMOS spectral efficiency in 5G base stations with 64–128 antennas and 200–400 MHz bandwidth?
- RQ2At what point in time will quantum annealing achieve a power advantage over CMOS in 5G baseband processing?
- RQ3What level of quantum hardware maturity (in terms of qubit count and coherence) is needed for QA to reduce operational costs and CO₂ emissions in NextG networks?
- RQ4How does the economic viability of QA depend on its capital cost relative to long-term OpEx savings from reduced power consumption?
Key findings
- With 3.1 million qubits and 102 μs problem latency, quantum annealing can match CMOS spectral efficiency while reducing power by 41 kW (45%) in a 64-antenna, 400 MHz 5G base station.
- In a 200 MHz, 64-antenna scenario, 1.5 million qubits would reduce power by 8 kW (16%) compared to CMOS.
- QA is projected to achieve a power advantage over 14 nm CMOS by 2035, requiring at least 618,000 qubits.
- For a power advantage over 1.5 nm CMOS, QA must reach at least 1.85 million qubits, expected by 2038.
- Economic feasibility is achievable if QA’s capital cost is below $200K, $400K, $1M, or $2M for payback in 1, 2, 5, or 10 years, respectively.
- CO₂ emissions could be reduced by up to 5.75 million metric kilotons over 10 years in a C-RAN deployment, depending on scenario and QA adoption.