Skip to main content
QUICK REVIEW

[Paper Review] ACE Science Workshop Report

Stefania Gori, Nhan Viet Tran|arXiv (Cornell University)|Mar 4, 2024
Particle Detector Development and PerformancePhysics and Astronomy2 citations
TL;DR

The ACE Science Workshop Report outlines a two-phase upgrade plan for Fermilab's accelerator complex—ACE-MIRT and ACE-BR—aimed at enabling next-generation experiments in muon physics, neutrinos, charged lepton flavor violation, and dark sectors. It identifies key accelerator R&D needs, including high-intensity beam production, targetry development, and muon cooling, with the goal of supporting multi-megawatt beam operations and advancing the U.S. intensity frontier in particle physics.

ABSTRACT

We summarize the Fermilab Accelerator Complex Evolution (ACE) Science Workshop, held on June 14-15, 2023. The workshop presented the strategy for the ACE program in two phases: ACE Main Injector Ramp and Target (MIRT) upgrade and ACE Booster Replacement (BR) upgrade. Four plenary sessions covered the primary experimental physics thrusts: Muon Collider, Neutrinos, Charged Lepton Flavor Violation, and Dark Sectors. Additional physics and technology ideas were presented from the community that could expand or augment the ACE science program. Given the physics framing, a parallel session at the workshop was dedicated to discussing priorities for accelerator R\&D. Finally, physics discussion sessions concluded the workshop where experts from the different experimental physics thrusts were brought together to begin understanding the synergies between the different physics drivers and technologies. In December of 2023, the P5 report was released setting the physics priorities for the field in the next decade and beyond, and identified ACE as an important component of the future US accelerator-based program. Given the presentations and discussions at the ACE Science Workshop and the findings of the P5 report, we lay out the topics for study to determine the physics priorities and design goals of the Fermilab ACE project in the near-term.

Motivation & Objective

  • To define a strategic roadmap for the Fermilab Accelerator Complex Evolution (ACE) program in support of next-generation particle physics.
  • To identify and prioritize key accelerator and detector R&D needs for high-intensity beam experiments.
  • To assess synergies among major physics drivers: muon colliders, neutrino physics, charged lepton flavor violation, and dark sector searches.
  • To ensure the ACE program supports the P5 report's vision for the U.S. intensity frontier, including 2+ MW beam power and long-term reliability.
  • To guide the design of future facilities such as muon cooling demonstrators, proton accumulator rings, and target demonstrators.

Proposed method

  • Proposes two-phase ACE upgrade: ACE-MIRT (Main Injector Ramp and Target) for early 2 MW beam delivery to DUNE, and ACE-BR (Booster Replacement) for full 2.4+ MW beam power.
  • Outlines accelerator configurations including 0.8 GeV accumulator rings, 8 GeV linacs, and 2 GeV linacs to support diverse physics programs.
  • Emphasizes R&D in high-gradient RF cavities, SRF technology, metallized ceramic beam pipes, and radiation-resistant materials.
  • Recommends staging of target demonstrator facilities at lower beam power (e.g., 200–400 kW) to test muon production and beam dump physics before full upgrades.
  • Proposes conceptual designs for a PIP-II Accumulator Ring (PAR) to enhance beam availability and support early physics programs.
  • Identifies muon cooling demonstrator facilities as critical R&D milestones, with target timelines for conceptual design and prototype fabrication within five years.

Experimental results

Research questions

  • RQ1How can the Fermilab accelerator complex be upgraded to deliver multi-megawatt proton beams for DUNE and future experiments?
  • RQ2What are the key accelerator R&D priorities to enable high-intensity muon and neutrino beams for precision and discovery physics?
  • RQ3How can synergies between muon colliders, CLFV, neutrino, and dark sector experiments be maximized through shared infrastructure and beamlines?
  • RQ4What are the optimal configurations for future proton driver facilities, including accumulator rings and linacs, to support multiple physics programs?
  • RQ5What are the critical material and targetry challenges for high-dose, high-repetition-rate beam operations, and how can they be mitigated?

Key findings

  • ACE-MIRT aims to reduce Main Injector ramp time to deliver up to 2.1 MW to DUNE by ~2033, with a target of 2.4 MW as the ultimate goal.
  • The ACE-BR upgrade will replace the Fermilab Booster to enable full 2.4+ MW beam power and support next-generation experiments.
  • A 0.8 GeV accumulator ring is identified as a high-impact upgrade to enhance beam dump and CLFV physics reach.
  • The PIP-II Accumulator Ring (PAR) proposal is under development to support early beam commissioning and 100 kW low-duty-factor proton programs.
  • R&D for a muon cooling demonstrator facility is prioritized, with a 5-year timeline for conceptual design and prototype fabrication.
  • Targetry R&D is critical for high-dose operations, with a focus on irradiated materials and advanced target concepts for muon and dark sector experiments.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.