Skip to main content
QUICK REVIEW

[Paper Review] Characterizing Curtailed and Uneconomic Renewable Power in the Mid-continent Independent System Operator

Andrew A. Chien, Fan Yang|arXiv (Cornell University)|Dec 18, 2016
Smart Grid Energy ManagementEngineering10 references8 citations
TL;DR

This study characterizes stranded power—curtailed and uneconomically priced renewable generation—in the MISO grid using 40 months of 5-minute resolution data. It finds stranded power is prevalent (99% of time, averaging over 1 GW), with long-duration intervals (mean 109 hours), and demonstrates that targeted energy storage at high-stranded sites can significantly improve utilization, though scalability to 100% duty factor requires massive storage capacity with diminishing returns.

ABSTRACT

As power grids incorporate increased renewable generation such as wind and solar, their variability creates growing challenges for grid stability and efficiency. We study two facets: power the grid is unable to accept (curtailment), and power that is assigned zero economic value by the grid (negative or zero price). Collectively we term these "stranded power" or SP. We study stranded power in the Midcontinent Independent System Operator (MISO), characterizing quantity and temporal structure. First, stranded power is available in the MISO grid 99% of the time, and often in intervals >100 hours, with characteristic seasonal and time-of-day patterns. Average stranded power often exceeds 1 GW, with duty factors as high as 30%. About 30% of all wind generation in MISO is stranded. Examination of the top 10 individual sites shows stranded power can be as high as 70% duty factor and 250MW. Trends over the past 3.5 years suggest stranded power is a persistent phenomenon. The study characterizes opportunities to exploit stranded power. We consider using energy storage to increase the utility of stranded power. For a range of power levels and uniformly-distributed storage, adding 5 hours of storage doubles duty factor to 30% at 4MW, but another 95 hours is required for the next 15% increase. At 4MW with 50 hours of storage, only 3 of 200 sites reach 100% duty factor, and with 100 hours required for the next 10 sites. Higher power levels require 100's of hours. Storage at the top 10 sites is more productive, 5 hours increases duty factor to 70% at 4MW, but further storage has diminishing benefits. Studies of the amount of power served by storage show that distribution to the best sites provides 2 to 3.7-fold advantages over uniform distribution.

Motivation & Objective

  • To understand the temporal and spatial characteristics of stranded power—defined as curtailed or uneconomically priced renewable generation—in the MISO grid.
  • To quantify the magnitude, duration, and patterns of stranded power over a 3.5-year period to assess its persistence and scalability.
  • To evaluate the effectiveness of energy storage in increasing the usability of stranded power, particularly through site-specific deployment strategies.
  • To identify opportunities for demand-side load shifting, such as data center workloads, to exploit stranded power resources.
  • To inform future grid planning and renewable integration by quantifying the challenges and opportunities associated with high renewable penetration.

Proposed method

  • Analyzes 40 months of high-resolution (5-minute) MISO market data, including potential generation (eco_max), actual accepted generation, and locational marginal pricing (LMP).
  • Defines 'stranded power' (SP) as the sum of curtailed generation and generation assigned zero or negative economic value (negative LMP).
  • Computes duty factor as the fraction of time a site’s generation is stranded, and analyzes temporal patterns across seasons and time-of-day.
  • Models energy storage deployment at individual sites using power and energy capacity parameters, simulating how storage increases usable generation time.
  • Compares uniform storage distribution across all sites versus targeted deployment at top 10 high-stranded sites to evaluate efficiency gains.
  • Uses statistical analysis to characterize duration, frequency, and magnitude of stranded power intervals, including mean, standard deviation, and maximum durations.

Experimental results

Research questions

  • RQ1How prevalent and temporally persistent is stranded power in the MISO grid, and what are its characteristic duration and seasonal patterns?
  • RQ2What is the total annual quantity of stranded power in MISO, and how does it vary over time across different wind generation sites?
  • RQ3To what extent can energy storage increase the usability of stranded power, and how does this depend on storage capacity, power level, and site selection?
  • RQ4How does the distribution strategy of storage (uniform vs. targeted) affect the improvement in duty factor and overall system efficiency?
  • RQ5What are the economic and technical limits to achieving near-100% duty factor for stranded power using current storage technologies?

Key findings

  • Stranded power is available 99% of the time in MISO, with a mean duration of 109 hours (stdev 110 hours), and maximum intervals reaching 816 hours.
  • Average stranded power exceeds 1 GW, with a duty factor of 30% at that level, and 30% of all wind generation in MISO is stranded.
  • At the top 10 individual sites, stranded power can reach a 70% duty factor and 250 MW of power, with 100% duty factor achievable only with 50–100 hours of storage at 4 MW.
  • Adding 5 hours of storage at 4 MW increases duty factor to 30% with uniform distribution, but only 3 of 200 sites reach 100% duty factor at 50 hours, and 10 more require 100 hours.
  • Storage at the top 10 sites is significantly more effective: 5 hours of storage increases duty factor to 70% at 4 MW, with diminishing returns beyond that.
  • Distributing storage to the best 5 sites yields 2 to 3.7 times greater benefit than uniform distribution, highlighting the importance of site selection for maximizing utilization.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.