[Paper Review] High Energy Hadron Colliders - Report of the Snowmass 2013 Frontier Capabilities Hadron Collider Study Group
This Snowmass 2013 report advocates for the continued development of high-energy hadron colliders, prioritizing the High Luminosity LHC (HL-LHC) and future 100 TeV proton colliders. It emphasizes Nb3Sn superconducting magnet technology as essential for achieving higher luminosity and energy, enabling discovery physics beyond the Standard Model, with strong U.S. participation in R&D critical for success.
High energy hadron colliders have been the tools for discovery at the highest mass scales of the energy frontier from the SppS, to the Tevatron and now the LHC. This report reviews future hadron collider projects from the high luminosity LHC upgrade to a 100 TeV hadron collider in a large tunnel, the underlying technology challenges and R&D directions and presents a series of recommendations for the future development of hadron collider research and technology.
Motivation & Objective
- To ensure the full exploitation of the LHC's discovery potential through the High Luminosity LHC (HL-LHC) upgrade.
- To assess the feasibility and technological requirements for a future 100 TeV proton collider (VHE-LHC) beyond the LHC tunnel.
- To establish the role of advanced superconducting magnet technology—particularly Nb3Sn and future HTS—as the cornerstone of future energy frontier colliders.
- To advocate for sustained U.S. leadership in magnet R&D and international collaboration to maximize discovery potential at CERN and beyond.
- To guide long-term U.S. high-energy physics roadmap through participation in design studies of high-energy proton colliders.
Proposed method
- Proposes the HL-LHC upgrade with increased luminosity (3000 fb⁻¹) via reduction of β∗ and use of 150 mm aperture Nb3Sn quadrupoles in interaction regions.
- Relies on Nb3Sn superconducting technology developed by the LARP consortium to achieve magnetic fields above 12 T, exceeding NbTi limits.
- Evaluates the HE-LHC option (26–33 TeV center-of-mass energy) using Nb3Sn magnets and explores the VHE-LHC (100 TeV) using 20 T HTS magnets in a larger tunnel.
- Analyzes synchrotron radiation effects at high energies, proposing beam screen cooling solutions and cold finger photon stops to manage heat loads.
- Models cryogenic power requirements, estimating 150–200 MW for a 100 TeV collider due to increased tunnel length and synchrotron radiation.
- Considers beam stability via strong transverse damping from synchrotron radiation, with damping times reduced to ~30 minutes at 50 TeV/beam.
Experimental results
Research questions
- RQ1What are the key technological and engineering challenges for achieving 3000 fb⁻¹ integrated luminosity at the HL-LHC?
- RQ2To what extent can Nb3Sn superconducting magnet technology enable higher energy and luminosity in future hadron colliders?
- RQ3What are the feasibility and cost implications of constructing a 100 TeV proton collider in a new, larger tunnel?
- RQ4How can synchrotron radiation be managed in high-energy proton colliders without compromising beam stability or increasing magnet aperture?
- RQ5What role should the U.S. play in long-term R&D for high-field magnets to support future energy frontier physics?
Key findings
- The HL-LHC upgrade is essential to achieve 3000 fb⁻¹ of integrated luminosity, enabling precision measurements and rare process searches.
- Nb3Sn superconducting magnets with peak fields above 12 T are required for the HL-LHC, and their development through LARP is critical for success.
- Nb3Sn technology can support a 26 TeV center-of-mass energy in the LHC tunnel, with a potential 33 TeV reach using 20 T HTS magnets.
- A 100 TeV proton collider in a new tunnel is feasible in principle, but requires major advances in magnet technology, cryogenics, and thermal management.
- Synchrotron radiation at 50 TeV/beam provides strong transverse damping (~30 min timescale), significantly improving beam stability.
- Cryogenic power requirements for a 100 TeV collider are estimated at 150–200 MW, making it a major cost driver and system challenge.
Read this paper
Open the full text in the Nubint reader and ask about any passage as you read.
Read this paper on NubintThis review was generated by AI from the original paper. Please check the paper before citing it.