TL;DR

This paper proposes an Iterated Variable Neighborhood Search (IVNS) algorithm for the resource-constrained multi-mode multi-project scheduling problem (RCMMMPSP), integrating mode selection and scheduling via a serial scheduling scheme. The approach uses a permutation-based representation and local search with multiple neighborhood operators, achieving competitive results on MISTA 2013 Challenge instances, including optimal or near-optimal solutions for several datasets within tight time limits.

ABSTRACT

The resource constrained multi-mode multi-project scheduling problem (RCMMMPSP) is a notoriously difficult combinatorial optimization problem. For a given set of activities, feasible execution mode assignments and execution starting times must be found such that some optimization function, e.g. the makespan, is optimized. When determining an optimal (or at least feasible) assignment of decision variable values, a set of side constraints, such as resource availabilities, precedence constraints, etc., has to be respected. In 2013, the MISTA 2013 Challenge stipulated research in the RCMMMPSP. It's goal was the solution of a given set of instances under running time restrictions. We have contributed to this challenge with the here presented approach.

Motivation & Objective

  • To address the challenging RCMMMPSP involving multiple projects, renewable and non-renewable resources, and precedence constraints.
  • To develop a heuristic method that efficiently finds feasible and high-quality schedules under strict time limits, as required by the MISTA 2013 Challenge.
  • To integrate mode assignment and activity sequencing into a unified search framework using a permutation-based representation.
  • To improve solution quality through iterated local search with variable neighborhood structures and perturbation mechanisms.
  • To evaluate the method on real-world-like instances from the MISTA 2013 Challenge, focusing on lexicographic minimization of total project delay and makespan.

Proposed method

  • The solution is represented as a pair of vectors: mode assignment (M) and activity sequence (S), where S defines the order of scheduling via a serial scheduling scheme (SSS).
  • Initial feasible solutions are generated by random mode assignment followed by a repair procedure that minimizes non-renewable resource overuse to restore feasibility.
  • A serial scheduling scheme (SSS) decodes the sequence vector S into a feasible schedule by respecting precedence constraints and assigning earliest possible start times.
  • Four neighborhood operators are employed: swap, insertion, reversal, and SMC (shift-then-merge-construct), each with O(n²) complexity.
  • The algorithm uses iterated local search with perturbation to escape local optima, combining intensification and diversification.
  • Parallelization is applied via four worker threads for smaller instances (n < 307), while larger instances use all cores on a single solution path to improve local search efficiency.

Experimental results

Research questions

  • RQ1Can a unified representation combining mode assignment and activity sequence effectively solve the RCMMMPSP under time constraints?
  • RQ2How effective is the combination of variable neighborhood search and iterated local search in navigating the complex solution space of the RCMMMPSP?
  • RQ3To what extent can a randomized repair procedure reliably generate feasible mode assignments in the presence of tight non-renewable resource limits?
  • RQ4How does the performance of the IVNS approach compare to other heuristics on the MISTA 2013 Challenge benchmark instances?
  • RQ5What is the impact of parallelization on convergence and solution quality for large-scale RCMMMPSP instances?

Key findings

  • The algorithm achieved optimal or near-optimal results on several MISTA 2013 Challenge instances, including A-1.txt with TPD=1 and TMS=23, matching the best-known solution.
  • For dataset B-9 (n=642), no local optimum was found within the time limit, indicating scalability challenges for large instances.
  • The median values across 20 runs were consistently close to the best results, suggesting robustness, though some variance was observed, especially in larger instances.
  • The repair procedure successfully generated feasible mode assignments for all 1,642 MISTA 2013 datasets, despite the NP-completeness of the mode selection subproblem.
  • The use of a lexicographic objective function with α=100,000 allowed effective combination of TPD and TMS into a single evaluation function.
  • The algorithm's performance was reproducible: re-running with the same seed produced identical results, confirming determinism in the stochastic process.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.