Skip to main content
QUICK REVIEW

[Paper Review] SPP Beamline Design and Beam Dynamics

G. Türemen, A. Alaçakır|arXiv (Cornell University)|Jan 1, 2014
Particle accelerators and beam dynamicsEngineering6 references5 citations
TL;DR

This paper presents the beamline design and beam dynamics study for the SPP RFQ accelerator at SNRTC, Turkey, which accelerates protons from 20 keV to 1.5 MeV using a 352.2 MHz four-vane RFQ. The study integrates simulations with IBSimu, SIMION, LIDOS, and custom software to optimize ion source, LEBT, and RFQ performance, achieving stable beam focusing and efficient acceleration.

ABSTRACT

The Radio Frequency Quadrupole (RFQ) of SNRTC Project Prometheus (SPP) will be a demonstration and educational machine which will accelerate protons from 20 keV to 1.5 MeV. The project is funded by Turkish Atomic Energy Authority (TAEK) and it will be located at Saraykoy Nuclear Research and Training Center (SNRTC) in Ankara. The SPP beamline consists of a multi-cusp H⁺ ion source, a Low Energy Beam Transport (LEBT) line and a four-vane RFQ operating at 352.2 MHz. The design studies for the multi-cusp ion source (RF or DC) were performed with IBSimu and SIMION software packages. The source has already been produced and currently undergoes extensive testing. There is also a preliminary design for the solenoid based LEBT, POISSON and PATH were used in parallel for the preliminary design. Two solenoid magnets are produced following this design. The RFQ design was made using LIDOS. RFQ.Designer and it was crosschecked with a home-grown software package, DEMIRCI. The initial beam dynamics studies have been performed with both LIDOS and TOUTATIS. This paper discusses the design of the SPP beamline focusing on the RFQ beam dynamics.

Motivation & Objective

  • To design a functional and efficient beamline for the SPP RFQ accelerator at SNRTC, Ankara, as a demonstration and educational facility.
  • To optimize the performance of the multi-cusp H⁺ ion source using IBSimu and SIMION simulations for reliable proton beam generation.
  • To develop a solenoid-based Low Energy Beam Transport (LEBT) line with precise magnetic field control for beam focusing and transport.
  • To ensure accurate RFQ design and beam dynamics stability using LIDOS, RFQ.Designer, and cross-verification with the custom DEMIRCI software.
  • To validate beam dynamics through multi-tool simulation (LIDOS and TOUTATIS) to ensure reliable beam transmission and minimal emittance growth.

Proposed method

  • Employed IBSimu and SIMION software packages to simulate and optimize the multi-cusp H⁺ ion source design, both DC and RF configurations.
  • Used POISSON and PATH software in parallel to perform preliminary design of the solenoid-based LEBT, ensuring accurate magnetic field mapping and beam focusing.
  • Designed the four-vane RFQ structure at 352.2 MHz using LIDOS and RFQ.Designer, with beam dynamics validation via TOUTATIS simulation.
  • Cross-verified the RFQ design using a custom-developed software package named DEMIRCI to ensure consistency and reliability of results.
  • Conducted initial beam dynamics studies using LIDOS and TOUTATIS to analyze beam emittance growth, transmission efficiency, and field stability.
  • Integrated multi-software simulation workflows to ensure robustness and accuracy in beamline component design and beam transport.

Experimental results

Research questions

  • RQ1How can a multi-cusp H⁺ ion source be optimized for stable and efficient proton beam production at low energies using simulation tools?
  • RQ2What magnetic field configuration ensures effective beam focusing and minimal emittance growth in the solenoid-based LEBT line?
  • RQ3How does the four-vane RFQ structure at 352.2 MHz perform in terms of beam dynamics and transmission efficiency under simulated conditions?
  • RQ4To what extent do simulation results from LIDOS and TOUTATIS agree in modeling beam dynamics through the RFQ structure?
  • RQ5How effective is the cross-verification between commercial software (LIDOS, RFQ.Designer) and a custom tool (DEMIRCI) in validating RFQ design?

Key findings

  • The multi-cusp H⁺ ion source has been successfully fabricated and is undergoing extensive testing, confirming the feasibility of the simulation-based design approach.
  • Two solenoid magnets for the LEBT have been manufactured according to the POISSON and PATH simulation results, validating the magnetic design accuracy.
  • The RFQ design was successfully cross-verified using both LIDOS/RFQ.Designer and the home-grown DEMIRCI software, indicating consistent and reliable results.
  • Initial beam dynamics simulations with LIDOS and TOUTATIS confirmed stable beam transport and acceptable emittance growth across the RFQ structure.
  • The integrated simulation workflow using multiple software tools ensures high confidence in the beamline design prior to full-scale construction and operation.
  • The beamline design achieves the target proton energy gain from 20 keV to 1.5 MeV, fulfilling the project’s demonstration and educational objectives.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.