[Paper Review] The Economic Dispatch for Integrated Wind Power Systems Using Particle Swarm Optimization

Mohamed Abuella, Constantine J. Hatziadoniu|arXiv (Cornell University)|Sep 5, 2015
Electric Power System OptimizationEngineering10 references7 citations
TL;DR

This paper proposes a particle swarm optimization (PSO)-based economic dispatch model for power systems integrating wind and thermal generators, accounting for wind power uncertainty through penalty and reserve costs. The method minimizes total generation cost—including wind generation, over/underestimation penalties, and reserve costs—demonstrating that high reserve costs reduce wind power utilization, while wind speed variability and cost coefficients significantly influence dispatch outcomes on a 6-bus test system.

ABSTRACT

The economic dispatch of wind power units is quite different from that in conventional thermal units, since the adopted model should take into consideration the intermittency nature of wind speed as well. Therefore, this paper uses a model that takes into account the aforementioned consideration in addition to whether the utility owns wind turbines or not. The economic dispatch is solved by using one of the modern optimization algorithms: the particle swarm optimization algorithm. A 6-bus system is used and it includes wind-powered generators besides to thermal generators. The thorough analysis of the results is also provided.

Motivation & Objective

  • To address the challenge of economic dispatch in power systems with intermittent wind power, which differs fundamentally from conventional thermal-only systems.
  • To develop a cost model that accounts for wind power uncertainty, including penalty costs for underestimation and reserve costs for overestimation.
  • To apply the particle swarm optimization (PSO) algorithm to solve the economic dispatch problem with wind integration.
  • To analyze the impact of wind speed variability (modeled via Weibull distribution) and cost coefficients on optimal dispatch decisions.
  • To evaluate the sensitivity of dispatch outcomes to reserve and penalty cost coefficients, and to assess PSO's performance in this context.

Proposed method

  • The economic dispatch problem is formulated as a nonlinear optimization with the objective of minimizing total generation cost, including quadratic costs for thermal units and linear wind power costs.
  • Wind power uncertainty is modeled using a Weibull probability distribution for wind speed, with associated penalty and reserve costs for over- and under-scheduling.
  • Penalty cost $ C_p $ is calculated as the expected cost of surplus wind power when scheduled below actual availability, and reserve cost $ C_r $ as the expected cost of wind deficit when scheduled above actual availability.
  • The PSO algorithm is employed to solve the constrained optimization problem, with particle positions representing generator outputs and velocities updated based on personal and global best solutions.
  • Constraints include generator real power limits, transmission line losses, and power balance between total generation and system demand.
  • The model distinguishes between cases where the utility owns wind turbines (no direct cost) and those where it does not (incur maintenance or payback costs).

Experimental results

Research questions

  • RQ1How does wind power uncertainty—through underestimation and overestimation—affect the economic dispatch cost and scheduling decisions?
  • RQ2What is the impact of varying the reserve cost coefficient $ k_r $ on wind power scheduling and total system cost?
  • RQ3How do changes in the wind speed scale factor $ c $ influence wind power availability and dispatch outcomes?
  • RQ4How do penalty cost $ k_p $ and reserve cost $ k_r $ jointly affect the optimal dispatch of wind and thermal generators?
  • RQ5To what extent does the PSO algorithm effectively solve the economic dispatch problem in systems with wind integration, and how sensitive is it to parameter settings?

Key findings

  • When the reserve cost coefficient $ k_r $ exceeds 60, wind power is no longer dispatched due to high economic penalty, and all generation shifts to thermal units.
  • For $ k_r = 100 $, wind power scheduling shows minimal increase even as wind speed variability increases, indicating strong disincentive to rely on wind power.
  • At $ k_r = 60 $, the system completely avoids wind power scheduling, confirming a critical threshold beyond which wind becomes economically unviable.
  • With $ k_r = 0 $, wind power is fully scheduled regardless of wind speed scale factor $ c $, as long as $ k_p > 0 $, indicating that overestimation penalties drive full wind utilization.
  • As the scale factor $ c $ increases from 5 to 20 m/s, wind power output increases significantly, demonstrating that higher average wind speeds improve wind dispatchability.
  • The PSO algorithm successfully converges to optimal dispatch solutions, but requires careful tuning of parameters and further theoretical analysis for convergence guarantees.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.