[Paper Review] The use of distributed thermal storage in district heating grids for demand side management
This paper proposes an active, model predictive control strategy for a small-scale district heating system with a gas-fired CHP, using distributed thermal storage—either in centralized buffers, distributed vessels, or building thermal mass—to shift heat production to high electricity price periods, maximizing CHP profitability. The study finds that utilizing building thermal mass performs nearly as well as distributed buffers with zero added investment, making it highly promising for demand-side management.
The work presented in this paper relates to a small scale district heating network heated by a gas fired CHP. In most common situations, such a CHP is heat driven operated, meaning that the CHP will switch on whenever heat is needed, while not taking into account the demand of electricity at that time. In this paper however, an active control strategy is developed, aiming to maximize the profit of the CHP, selling its electricity to the spot market. The CHP will therefore switch on at moments of high electricity prices. Nevertheless, since there never is a perfect match between the demand of heat and the demand of electricity, a thermal energy storage is included in the network to overcome the difference between supply and demand of heat in the network. In this study, three different storage concepts are compared: (1) a central buffer tank next to the CHP; (2) small storage vessels distributed over the different connected buildings; and (3) the use of the thermal mass if the buildings as storage capacity. Besides the development of the control algorithms based on model predictive control, a simulation model of the network is described to evaluate the performance of the different storage concept during a representative winter week. The results show that the presented control algorithm can significantly influence the heat demand profile of the connected buildings. As a results, active control of the CHP can drastically increase the profit of the CHP. The concept with the distributed buffers gives the best results, however the profit for the thermal mass concept is only marginally smaller. Since in this latter case no significant investment costs are needed, the conclusion for this case study is that the use of thermal mass of buildings for demand side management in district heating systems is very promising.
Motivation & Objective
- To develop an active control strategy for a CHP in a district heating network that maximizes profit by scheduling electricity generation during high-price periods.
- To compare three thermal storage configurations: central buffer, distributed buffers, and building thermal mass, for their effectiveness in enabling active CHP control.
- To evaluate the operational performance and economic profitability of each storage configuration under real-world electricity price fluctuations.
- To assess the potential of building thermal mass as a low-cost alternative to engineered thermal storage for demand response in district heating systems.
Proposed method
- A model predictive control (MPC) algorithm is developed to optimize CHP operation based on real-time electricity prices and heat demand forecasts.
- A detailed simulation model of a small-scale district heating network is built, including heat production, distribution, and building thermal dynamics.
- Three storage configurations are simulated: a central buffer tank, distributed small-volume storage vessels, and the thermal mass of buildings as passive storage.
- The control strategy prioritizes CHP activation during high electricity price periods, storing excess heat in the selected storage medium to decouple heat and electricity production.
- Operational costs (gas, pumping) and revenues (heat and electricity sales) are calculated using real Belgian energy prices over a representative winter week.
- Performance is evaluated based on profit, energy efficiency, and load profile shaping.
Experimental results
Research questions
- RQ1How does active CHP control using thermal storage affect the profitability of a small-scale district heating system?
- RQ2What is the relative performance of central, distributed, and building thermal mass storage in enabling profitable CHP operation?
- RQ3To what extent can building thermal mass replace engineered storage solutions in demand-side management?
- RQ4How does the use of model predictive control influence the heat demand profile and system flexibility?
- RQ5What is the trade-off between investment cost and operational profit across different storage configurations?
Key findings
- Active control of the CHP using model predictive control significantly increases profitability by aligning electricity generation with high market prices.
- The distributed buffer configuration yields the highest profit, outperforming both the central buffer and reference heat-driven operation.
- The building thermal mass configuration achieves nearly the same profit as the distributed buffer case, despite requiring no additional investment.
- The central buffer configuration underperforms relative to distributed and building mass solutions, despite higher theoretical flexibility, due to less effective utilization of thermal inertia.
- The total thermal mass of the buildings (4165 kWh/K) is over 100 times greater than that of the central buffer (39.5 kWh/K), enabling far greater system flexibility.
- The difference in profit between the active case without buffers and the distributed buffer case is minimal, indicating that building mass alone provides substantial operational benefit.
Read this paper
Open the full text in the Nubint reader and ask about any passage as you read.
Read this paper on NubintThis review was generated by AI from the original paper. Please check the paper before citing it.