Skip to main content
QUICK REVIEW

[Paper Review] Two Techniques That Enhance the Performance of Multi-robot Prioritized Path Planning

Anton Andreychuk, Konstantin Yakovlev|arXiv (Cornell University)|May 3, 2018
Robotic Path Planning AlgorithmsComputer Science7 citations
TL;DR

This paper introduces two novel techniques to improve prioritized multi-robot path planning: deterministic re-scheduling, which systematically reassigns priority to the failing robot to avoid repeated failures, and safe-start-intervals (SSI), which block high-priority robots from occupying low-priority robots' start positions for a defined time. Experiments show these methods significantly increase success rates and reduce runtime compared to baseline and random re-scheduling, especially in dense environments.

ABSTRACT

We introduce and empirically evaluate two techniques aimed at enhancing the performance of multi-robot prioritized path planning. The first technique is the deterministic procedure for re-scheduling (as opposed to well-known approach based on random restarts), the second one is the heuristic procedure that modifies the search-space of the individual planner involved in the prioritized path finding.

Motivation & Objective

  • To address the high failure rate of prioritized multi-robot path planners in dense environments due to suboptimal priority ordering and interference at start positions.
  • To improve the effectiveness and efficiency of prioritized planners by replacing random restarts with a deterministic re-scheduling strategy.
  • To reduce planner failures caused by high-priority robots blocking low-priority robots' start locations through a time-based inhibition mechanism.
  • To empirically evaluate the impact of these techniques on success rate, runtime, makespan, and flowtime across varying robot densities.
  • To provide plug-and-play enhancements compatible with any existing prioritized path planner.

Proposed method

  • Introduces deterministic re-scheduling: when a robot fails to find a path, its priority is raised to 1, and the planner restarts from the beginning, avoiding redundant failure patterns.
  • Proposes safe-start-intervals (SSI): a time interval [0, k] during which no robot may enter the start location of a lower-priority robot, preventing early interference.
  • Applies SSI to restrict motion near start positions, increasing the chance of finding feasible paths for low-priority robots.
  • Uses a state-of-the-art prioritized planner, AA-SIPP(m), as the base solver to evaluate the techniques under controlled conditions.
  • Employs a 'shortest-first' initial priority assignment and evaluates performance across 100 random instances per robot count.
  • Implements a time cap of 5 minutes for random re-scheduling to ensure fair comparison with deterministic re-scheduling.

Experimental results

Research questions

  • RQ1Does deterministic re-scheduling outperform random re-scheduling in terms of success rate and runtime for prioritized multi-robot path planning?
  • RQ2To what extent does introducing safe-start-intervals (SSI) improve the success rate of prioritized planners in dense robot configurations?
  • RQ3How do SSI and deterministic re-scheduling affect makespan and flowtime compared to baseline and random re-scheduling?
  • RQ4Can these techniques solve previously unsolvable instances due to start-position interference?
  • RQ5Is the performance gain consistent across varying robot densities and environment types?

Key findings

  • On a 32×32 empty grid, setting SSI to k=3 or higher increased success rate from 0% (baseline) to over 80% for 192 robots (18.75% density).
  • In the warehouse-like environment (21×35 grid with 100 blocked cells), deterministic re-scheduling achieved 99% success rate at 160 robots, compared to only 42% with random re-scheduling.
  • For 160 robots, the deterministic method was 4× faster than random re-scheduling, with a runtime of 28.28 seconds vs. 117.82 seconds.
  • Despite a slight increase in makespan, the deterministic method achieved better flowtime (5298.85 vs. 5220.90) at 160 robots, indicating improved overall solution quality.
  • The combination of SSI and deterministic re-scheduling enabled the planner to solve instances that were previously unsolvable due to start-position blocking.
  • The proposed techniques significantly outperform both baseline and random re-scheduling in success rate, runtime, and solution quality, especially at high robot densities.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.