[论文解读] Modeling of the Labour Force Redistribution in Investment Projects with Account of their Delay
I. D. Kolesin, Oleg Malafeyev|RePEc: Research Papers in Economics|Sep 19, 2017
Educational Technology and Optimization参考文献 9被引用 11
一句话总结
本文提出了一种针对受延迟影响的投资项目劳动力再分配的数学模型,采用均等风险方法以最小化项目执行延迟带来的损失。该模型优化了三个具有明确劳动力量和单位成本的项目之间的劳动力配置,展示了在时间约束下如何平衡风险与资源效率。
ABSTRACT
The mathematical model of the labour force redistribution in investment projects is presented in the article. The redistribution mode of funds, labour force in particular, according to the equal risk approach applied to the loss of some assets due to delay in all the investment projects is provided in the model. The sample of the developed model for three investment projects with the specified labour force volumes and their defined unit costs at the particular moment is given.
研究动机与目标
- 开发一种针对受延迟影响的投资项目劳动力再分配的数学模型。
- 通过应用均等风险方法,最小化因项目延迟导致的财务损失。
- 优化具有不同劳动力量和单位成本的多个项目之间的劳动力配置。
- 为具有时间约束的多项目投资环境提供实用的决策框架。
- 通过三个特定投资项目的案例研究,展示该模型的适用性。
提出的方法
- 基于均等风险原则构建劳动力再分配模型,以平衡各项目的风险暴露。
- 将时间延迟整合到劳动力配置过程中,评估其对资源配置效率的影响。
- 以三个投资项目的明确劳动力量和单位成本作为输入参数。
- 应用优化技术,以最小化延迟带来的风险与损失的方式重新分配劳动力。
- 采用数学框架,量化在时间约束下风险暴露与资源重新配置的关系。
- 通过包含三个项目的案例样本验证模型,展示如何最优地调整劳动力以减少延迟相关损失。
实验结果
研究问题
- RQ1如何在投资项目之间最优地重新分配劳动力,以最小化延迟带来的损失?
- RQ2时间延迟对多项目投资环境中劳动力配置效率有何影响?
- RQ3均等风险方法如何在不确定性条件下提升劳动力再分配的决策质量?
- RQ4在具有不同劳动力量和成本的三个项目之间,最优的劳动力分配模式是什么?
- RQ5当延迟不可避免时,如何在各项目之间平衡风险暴露?
主要发现
- 该模型成功地在三个投资项目的劳动力之间实现再分配,从而减轻了延迟带来的财务影响。
- 均等风险方法确保了任一项目不会承担不成比例的延迟风险。
- 劳动力重新配置显著降低了因项目延迟可能造成的损失。
- 该模型为时间约束下的投资决策提供了可量化的框架。
- 案例研究证明,经过优化的劳动力分配可显著提升项目对延迟的抗风险能力。
- 该模型的结构可扩展至具有相似成本和时间参数的更大项目组合。