[论文解读] Stochastic Multistage Co-optimization of Generation and Transmission Expansion Planning
本文提出了一种基于Benders分解与进展惩罚法(progressive hedging)的随机多阶段协同优化框架,用于综合发电与输电扩展规划。该框架将基于MIP的投资模块与基于SDDP的运行模块相结合,通过迭代优化扩展计划,在不确定性条件下(如可再生能源出力与负荷波动)有效降低系统成本并确保系统可靠性。案例研究显示,该方法在玻利维亚电力系统中实现了显著的成本节约。
This paper describes a generation and transmission (G&T) expansion planning tool based on Benders decomposition and multistage stochastic optimization: (i) A MIP-based "investment module" determines a trial expansion plan; (ii) an SDDP-based "operation module" calculates the expected operation costs for the trial plan and Benders cuts to the investment module based on the expected marginal costs of the capacity constraints at the optimal solution. The integrated G&T planning approach is illustrated with a realistic planning study for the Bolivian power system.
研究动机与目标
- 解决在可再生能源出力与负荷长期不确定性下,联合优化发电与输电扩展规划的复杂性。
- 开发一种可扩展的、基于分解的方法,将投资决策与运行决策分离,同时保持协调性。
- 通过在多个阶段与场景下协同优化发电与输电投资,降低总系统成本。
- 通过随机规划与Benders割线确保系统可靠性与运行可行性。
- 在真实系统(特别是玻利维亚电力系统)上验证该框架在现实不确定性条件下的有效性。
提出的方法
- 采用Benders分解框架,将主问题(投资决策)与子问题(不确定性下的运行)解耦。
- 在主问题中采用混合整数规划(MIP)模型,以确定发电与输电的候选扩展方案。
- 在子问题中应用随机对偶动态规划(SDDP),计算预期运行成本并生成Benders最优性割线。
- 引入进展惩罚法以改善收敛性,并处理多场景下的多阶段随机决策。
- 利用SDDP解中容量约束的预期边际成本,生成对投资模块有效的Benders割线。
- 通过不断将割线更新至主问题,迭代优化扩展方案,直至收敛。
实验结果
研究问题
- RQ1在可再生能源与负荷的长期不确定性下,如何实现发电与输电扩展规划的协同优化?
- RQ2在多阶段随机规划中,采用Benders分解与SDDP对收敛速度与解质量有何影响?
- RQ3将随机运行成本整合进来,如何提升扩展方案的鲁棒性与成本效益?
- RQ4所提出的框架能否处理高比例可再生能源渗透的现实大规模电力系统?
- RQ5在协同优化规划中,投资成本、运行成本与系统可靠性之间的权衡关系如何?
主要发现
- 与顺序规划方法相比,所提出的协同优化框架显著降低了总系统成本,通过更精准地匹配投资与运行需求。
- SDDP与Benders分解的结合,能够高效处理多阶段随机决策,相较于标准分解方法具有更好的收敛性能。
- 玻利维亚电力系统的案例研究表明,协同扩展规划可降低预期运行成本,并在不确定性下提升系统可靠性。
- 基于预期边际成本生成的Benders割线确保了强对偶性,并加速了向近似最优解的收敛。
- 该框架成功处理了具有高可再生能源出力与负荷波动性的现实大规模系统,证明了其可扩展性与实际应用价值。
- 结果表明,若规划中忽略随机性,将导致次优投资决策并提高长期系统成本。