Skip to main content

Dong-Ho Lee

Hanyang University · 工学

研究室紹介

Professor Dong-Ho Lee's research lab specializes in sustainable manufacturing and operations management, with a strong focus on disassembly systems, remanufacturing, and flexible scheduling in circular economy contexts. The lab investigates decision-making problems in end-of-life product recovery, including disassembly planning, scheduling, and sequencing under uncertainty, while integrating economic and environmental objectives. Research also extends to wireless sensor networks for smart systems, particularly congestion control in resource-constrained environments. The lab emphasizes practical, heuristic, and optimization-based solutions for real-world industrial challenges.

disassembly planningremanufacturing schedulingsustainable manufacturingflexible job shop schedulingcongestion control in WSN

Research Overview

Papers
441
Total Citations
4,536
Papers (5y)
47
Primary Field
工学

Research Output Trend

Figures are computed from collected data and may differ slightly.

Publications per year (5y)
47total
2021
2022
2023
2024
2025
Citations per year (5y)
204total
20212022202320242025

Selected Papers

15
1
Article|144 citations·2013
Heterogeneous fixed fleet vehicle routing considering carbon emission
Yong-Ju Kwon, Young‐Jae Choi, Dong-Ho Lee
SJR Q1Transportation Research Part D Transport and Environment
Industrial and Manufacturing EngineeringEngineering
2
Article|105 citations·2010
Real-time scheduling for reentrant hybrid flow shops: A decision tree based mechanism and its application to a TFT-LCD line
Hyun-Seon Choi, Ji-Su Kim, Dong-Ho Lee
SJR Q1Expert Systems with Applications
Industrial and Manufacturing EngineeringEngineering
3
Article|96 citations·2011
Disassembly process planning algorithms for end-of-life product recovery and environmentally conscious disposal
Yoen-Seok Ma, Hong-Bae Jun, HyungWon Kim, Dong-Ho Lee
SJR Q1International Journal of Production Research

Abstract Disassembly process planning is an act of preparing detailed operation instructions for disassembling used or an end-of-life (EOL) product to recover or dispose of its constituent parts or subassemblies. The main decisions are: (a) disassembly level; (b) disassembly sequence; and (c) EOL options such as reuse, remanufacturing, recycling, incineration, landfill, etc. This study deals with the three decision variables simultaneously in the parallel disassembly environment for the objectiv

Industrial and Manufacturing EngineeringEngineering
4
Article|76 citations·2002
Disassembly Scheduling with Capacity Constraints
Dong-Ho Lee, Paul Xirouchakis, Rainer Züst
SJR Q1CIRP Annals
Industrial and Manufacturing EngineeringEngineering
5
Article|76 citations·2013
A priority scheduling approach for flexible job shops with multiple process plans
Hyoung-Ho Doh, Jae-Min Yu, Ji-Su Kim, Dong-Ho Lee, Sung-Ho Nam
SJR Q1International Journal of Production Research

This paper considers the job shop scheduling problem with alternative operations and machines, called the flexible job shop scheduling problem. As an extension of previous studies, operation and routing flexibilities are considered at the same time in the form of multiple process plans, i.e. each job can be processed through alternative operations, each of which can be processed on alternative machines. The main decisions are: (a) selecting operation/machine pair; and (b) sequencing the jobs ass

Industrial and Manufacturing EngineeringEngineering
6
Article|72 citations·2013
A tabu search algorithm for unrelated parallel machine scheduling with sequence- and machine-dependent setups: minimizing total tardiness
Jaeho Lee, Jae-Min Yu, Dong-Ho Lee
SJR Q1The International Journal of Advanced Manufacturing Technology
Industrial and Manufacturing EngineeringEngineering
7
Article|65 citations·2004
A two-stage heuristic for disassembly scheduling with assembly product structure
Dong-Ho Lee, Paul Xirouchakis
SJR Q1Journal of the Operational Research Society

Disassembly scheduling, one of the important operational problems in disassembly systems, is the problem of determining the ordering and disassembly schedules of used or end-of-life products while satisfying the demand of their parts or components over a certain planning horizon. This paper considers products with assembly structure for the objective of minimizing the sum of purchase, set up, inventory holding, and disassembly operation costs, and suggests a two-stage heuristic, in which an init

Industrial and Manufacturing EngineeringEngineering
8
Article|64 citations·2010
Design optimization of a loop heat pipe to cool a lithium ion battery onboard a military aircraft
Yongjin Park, Sangook Jun, Sang-Hun Kim, Dong-Ho Lee
SJR Q2Journal of Mechanical Science and Technology
Mechanical EngineeringEngineering
9
Article|56 citations·2018
Scheduling algorithms for job-shop-type remanufacturing systems with component matching requirement
Jae-Min Yu, Dong-Ho Lee
SJR Q1Computers & Industrial Engineering
Strategy and ManagementBusiness, Management and Accounting
10
Article|53 citations·2010
Adaptive duty-cycle based congestion control for home automation networks
Dong-Ho Lee, Kwangsue Chung
SJR Q1IEEE Transactions on Consumer Electronics

There is a growing interest in the wireless sensor network technology in the home automation field, but as the number of sensor nodes in the home increases and as the data traffic generated by such nodes grows, the network becomes more congested. Due to resource constraints, a congestion control scheme for wireless sensor network should be designed with simplicity and operate energy efficiently. In this paper, we propose ADCC(Adaptive Duty-cycle Based Congestion Control), a lightweight congestio

Computer Networks and CommunicationsComputer Science
11
Article|52 citations·2018
Selective disassembly sequencing with random operation times in parallel disassembly environment
HyungWon Kim, Chuljin Park, Dong-Ho Lee
SJR Q1International Journal of Production Research

Selective disassembly sequencing is the problem of determining the sequence of disassembly operations to extract one or more target components of a product. This study considers the problem with random operation times in the parallel disassembly environment in which one or more components can be removed at the same time by a single disassembly operation. After representing all possible disassembly sequences using the extended process graph, a stochastic integer programming model is developed for

Industrial and Manufacturing EngineeringEngineering
12
Article|50 citations·2008
Scheduling algorithms for two-stage reentrant hybrid flow shops: minimizing makespan under the maximum allowable due dates
Hyun-Seon Choi, HyungWon Kim, Dong-Ho Lee, Junggee Yoon, Chang Yeon Yun, Kevin B. Chae
SJR Q1The International Journal of Advanced Manufacturing Technology
Industrial and Manufacturing EngineeringEngineering
13
Article|49 citations·2017
Priority scheduling to minimize the total tardiness for remanufacturing systems with flow-shop-type reprocessing lines
Jong‐Min Kim, Yidong Zhou, Dong-Ho Lee
SJR Q1The International Journal of Advanced Manufacturing Technology
Strategy and ManagementBusiness, Management and Accounting
14
Article|47 citations·2014
Scheduling algorithms for remanufacturing systems with parallel flow-shop-type reprocessing lines
Min-Geun Kim, Jae-Min Yu, Dong-Ho Lee
SJR Q1International Journal of Production Research

This study considers a scheduling problem for remanufacturing systems in which end-of-life products are separated into their major components at a disassembly workstation, each of them is reprocessed at its dedicated flow-shop-type reprocessing line with serial workstations, and finally, the reprocessed components, together with new components if required, are reassembled into remanufactured products at a reassembly workstation. Among various system configurations, we focus on the one with paral

Industrial and Manufacturing EngineeringEngineering
15
Article|47 citations·2013
Mathematical model and solution algorithms for selective disassembly sequencing with multiple target components and sequence-dependent setups
Hee-Jong Han, Jae-Min Yu, Dong-Ho Lee
SJR Q1International Journal of Production Research

This study considers selective disassembly sequencing under the sequential disassembly environment in which one component is obtained at each disassembly operation. The problem is to determine the sequence of disassembly operations to obtain multiple target components of a used or end-of-life product for the purpose of repair, reuse, remanufacturing, disposal, etc. In particular, we consider sequence-dependent setups in which setup costs depend on the disassembly operation just completed and on

Industrial and Manufacturing EngineeringEngineering

Research Areas

Industrial and Manufacturing EngineeringComputer Networks and CommunicationsStrategy and ManagementArtificial IntelligenceAerospace EngineeringInformation Systems

Dong-Ho Leeの研究をNubintでさらに深く

この研究室の論文をアプリで開き、AIと共に読み、要約し、引用しましょう。