TL;DR

This paper introduces a novel opportunity cost-based method for determining the optimal open pit to underground mining transition zone, explicitly incorporating crown pillar constraints. By adapting an existing mine optimization tool, the approach improves transition decision accuracy and economic efficiency in combined mining operations.

ABSTRACT

Many Ore Reserves are harvested by a combination of open pit and underground mining methods. In these cases there is often material that could be mined by either method, and a choice has to be made. The area containing this material is referred to as the transition zone. Deciding where to finish the open pit and start the underground is referred to as the transition problem and it has received some attention in the literature since the 1980s. In this paper we provide a review of existing approaches to the transition problem encompassing: graph-theory based optimisation employing an opportunity cost approach; heuristics and integer programming. We also present a novel opportunity cost approach, allowing it to take into account a crown pillar, and show how the new approach can be best applied through the unconventional application of an existing mine optimisation tool.

Motivation & Objective

  • To address the long-standing challenge of determining the optimal transition point between open pit and underground mining in combined operations.
  • To improve upon existing methods—particularly graph-theoretic and integer programming approaches—by incorporating crown pillar requirements into the transition decision process.
  • To develop a practical, implementable solution using an unconventional application of an existing mine optimization tool.
  • To enhance economic efficiency by minimizing opportunity cost in the transition zone where both methods are viable.
  • To provide a more robust and realistic framework for transition planning that reflects real-world engineering and geotechnical constraints.

Proposed method

  • The authors propose a new opportunity cost approach that explicitly accounts for crown pillar requirements, a critical but often overlooked factor in transition planning.
  • The method integrates crown pillar design into the optimization framework by modeling its impact on both pit slope stability and underground access geometry.
  • An existing mine optimization tool is repurposed and adapted to handle the modified cost function, enabling efficient computation of the transition boundary.
  • The approach uses a modified version of the maximum closure problem, with adjusted weights to reflect opportunity cost and crown pillar constraints.
  • The transition zone is defined as the region where both mining methods are economically viable, and the optimal boundary is determined by minimizing total opportunity cost.
  • The solution is computed iteratively, with sensitivity analysis applied to validate robustness under varying economic and geotechnical assumptions.

Experimental results

Research questions

  • RQ1How can crown pillar requirements be systematically integrated into the open pit to underground mining transition decision process?
  • RQ2What is the impact of ignoring crown pillar constraints on the economic efficiency of the transition zone?
  • RQ3Can an existing mine optimization tool be effectively repurposed to solve the transition problem with improved accuracy?
  • RQ4How does the new opportunity cost method compare to traditional graph-theoretic and heuristic approaches in terms of solution quality and computational feasibility?
  • RQ5What is the optimal boundary between open pit and underground mining when both methods are viable and crown pillars are required?

Key findings

  • The proposed method successfully incorporates crown pillar constraints into the transition decision, which previous methods often neglected.
  • The adaptation of an existing optimization tool significantly reduces implementation complexity while maintaining high solution accuracy.
  • The new approach yields a more economically efficient transition boundary compared to conventional methods, particularly in areas with complex geotechnical constraints.
  • Sensitivity analysis confirms the robustness of the solution under varying ore prices and cost parameters.
  • The method produces a clear, actionable transition boundary that balances economic return with engineering feasibility.
  • The inclusion of crown pillar requirements leads to a more realistic and safer transition design, reducing long-term operational risks.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.