[Paper Review] Fostering Project Scheduling and Controlling Risk Management

Abdul Razaque, Christian Bach|arXiv (Cornell University)|Oct 7, 2012
Software Engineering Techniques and PracticesComputer Science17 references11 citations
TL;DR

This paper proposes an integrated project scheduling and risk management framework that combines fuzzy FMEA, Monte Carlo simulation, and critical chain project management with adaptive procedure with density (APD) to optimize buffer times and enhance schedule reliability. The approach improves on traditional methods by proactively identifying, analyzing, and mitigating risks to ensure on-time, on-budget project delivery with reduced uncertainty.

ABSTRACT

Deployment of emerging technologies and rapid change in industries has created a lot of risk for initiating the new projects. Many techniques and suggestions have been introduced but still lack the gap from various prospective. This paper proposes a reliable project scheduling approach. The objectives of project scheduling approach are to focus on critical chain schedule and risk management. Several risks and reservations exist in projects. These critical reservations may not only foil the projects to be finished within time limit and budget, but also degrades the quality, and operational process. In the proposed approach, the potential risks of project are critically analyzed. To overcome these potential risks, fuzzy failure mode and effect analysis (FMEA) is introduced. In addition, several affects of each risk against each activity are evaluated. We use Monte Carlo simulation that helps to calculate the total time of project. Our approach helps to control risk mitigation that is determined using event tree analysis and fault tree analysis. We also implement distribute critical chain schedule for reliable scheduling that makes the project to be implemented within defined plan and schedule. Finally, adaptive procedure with density (APD) is deployed to get reasonable feeding buffer time and project buffer time.

Motivation & Objective

  • To address the growing risk in project scheduling due to rapid technological change and industry evolution.
  • To close the gap in existing scheduling techniques by integrating risk management more systematically.
  • To improve project reliability by optimizing buffer times using adaptive procedures.
  • To apply event tree and fault tree analyses for effective risk mitigation.
  • To ensure projects are completed within time, budget, and quality constraints through a robust scheduling framework.

Proposed method

  • Uses fuzzy failure mode and effect analysis (FMEA) to evaluate and prioritize potential project risks.
  • Applies Monte Carlo simulation to estimate total project duration based on risk-affected activity times.
  • Employs event tree and fault tree analyses to model risk impact and mitigation pathways.
  • Implements a distributed critical chain scheduling approach to enhance schedule robustness.
  • Utilizes adaptive procedure with density (APD) to calculate optimal feeding and project buffer times.
  • Integrates risk impact assessments across all project activities to inform buffer allocation and scheduling decisions.

Experimental results

Research questions

  • RQ1How can project scheduling be improved to better control risks in dynamic, technology-driven environments?
  • RQ2What is the optimal way to determine feeding and project buffer times in the presence of uncertain activity durations?
  • RQ3How can fuzzy FMEA be effectively combined with simulation and critical chain scheduling to enhance risk mitigation?
  • RQ4To what extent does the integration of event and fault tree analyses improve risk prediction and control?
  • RQ5Can the adaptive procedure with density (APD) outperform conventional buffer sizing methods in project scheduling?

Key findings

  • The proposed framework significantly improves project schedule reliability by integrating risk assessment with buffer time optimization.
  • Fuzzy FMEA enables more accurate identification and prioritization of critical risks compared to conventional FMEA.
  • Monte Carlo simulation provides robust estimates of project duration under uncertainty, supporting data-driven scheduling.
  • The use of APD leads to more reasonable and adaptive buffer time allocations, reducing schedule overruns.
  • Event and fault tree analyses effectively model risk propagation and mitigation, enhancing risk control.
  • The integrated approach ensures projects are completed within planned time and budget, with improved quality and operational performance.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.