TL;DR

This paper proposes upgrading the ILC250 to achieve a luminosity of 8.1×10³⁴ cm⁻²s⁻¹—enabling an effective luminosity of 2.0×10³⁵ cm⁻²s⁻¹ with polarization—by leveraging high-quality factor (Q) superconducting radiofrequency (SRF) cavities. The upgrade would cost ~2.2 B ILCU, bringing total ILC high-luminosity cost to 7.7 B ILCU, and requires only 267 MW AC power, making it more cost- and energy-efficient than FCC-ee.

ABSTRACT

In this paper, we address the possibility of upgrading the ILC250 luminosity to $8.1 imes 10^{34}$, so that with the polarization feature, the effective luminosity will be $2.0 imes 10^{35}$ to compete with the FCC-ee luminosity and two detectors. The additional cost of the higher luminosity option will be about 2.2 B ILCU. The total cost for the ILC high luminosity machine will therefore be about 7.7 B versus FCC-ee 10.5 B. The AC power (267 MW) to operate the ILC luminosity upgrade will also be less than the AC power for FCC-ee (300 MW). Even with a modest quality factor Q of $1 imes 10^{10}$ for SRF cavities, the total cost of the upgrade will be 2.5 B ILCU additional over ILC250 baseline. We expect that, if approved, ILC250 will first be built at the baseline luminosity, operated for many years at this luminosity, and later upgraded to the high luminosity option. A significant part (RF power and cryo-power) of the additional cost for the luminosity upgrade overlaps with the expected additional costs for anticipated energy upgrade paths. A second ILC upgrade discussed in this paper will be to the higher energy Top Factory at 380 GeV. We also estimate the additional cost of this upgrade (1.5 B ILCU).

Motivation & Objective

  • To evaluate the feasibility and cost of upgrading the ILC250 to achieve a luminosity of 8.1×10³⁴ cm⁻²s⁻¹ for enhanced physics reach.
  • To assess the impact of high Q-factor superconducting RF cavities on reducing the cost and power consumption of the luminosity upgrade.
  • To compare the total cost and AC power requirements of the upgraded ILC250 with those of the FCC-ee collider.
  • To estimate the cost and technical path for a subsequent upgrade of the ILC to 380 GeV center-of-mass energy (Top Factory).

Proposed method

  • Modeling the RF and cryogenic power requirements for ILC250 at 8.1×10³⁴ cm⁻²s⁻¹ luminosity using high Q-factor SRF cavities.
  • Estimating the additional cost of the luminosity upgrade based on increased RF and cryogenic power demands.
  • Comparing the AC power consumption of the upgraded ILC (267 MW) with that of FCC-ee (300 MW).
  • Assessing cost overlap between the luminosity upgrade and future energy upgrade paths to ILC380.
  • Using a baseline Q-factor of 1×10¹⁰ for SRF cavities to compute cost and performance trade-offs.
  • Projecting the cost of a subsequent upgrade from ILC250 to ILC380, estimating it at 1.5 B ILCU.

Experimental results

Research questions

  • RQ1What is the required increase in RF and cryogenic power to achieve 8.1×10³⁴ cm⁻²s⁻¹ luminosity in the ILC250?
  • RQ2How does the use of high Q-factor SRF cavities (Q = 1×10¹⁰) affect the cost and power efficiency of the ILC250 luminosity upgrade?
  • RQ3What is the total cost of the ILC250 high-luminosity upgrade, and how does it compare to the FCC-ee project cost?
  • RQ4What is the additional cost and technical path for upgrading the ILC from 250 GeV to 380 GeV center-of-mass energy?
  • RQ5To what extent do the cost and power requirements of the luminosity upgrade overlap with those of future energy upgrades?

Key findings

  • The ILC250 luminosity upgrade to 8.1×10³⁴ cm⁻²s⁻¹ would require an additional 2.2 B ILCU in cost, bringing the total ILC high-luminosity cost to 7.7 B ILCU.
  • With a modest Q-factor of 1×10¹⁰, the total cost of the luminosity upgrade is estimated at 2.5 B ILCU, indicating sensitivity to cavity performance.
  • The AC power requirement for the upgraded ILC250 is 267 MW, which is less than the 300 MW required for FCC-ee, indicating improved energy efficiency.
  • The effective luminosity of 2.0×10³⁵ cm⁻²s⁻¹ with polarization would allow the ILC to compete with FCC-ee in physics reach.
  • The cost of upgrading the ILC from 250 GeV to 380 GeV (Top Factory) is estimated at 1.5 B ILCU.
  • A significant portion of the cost for the luminosity upgrade overlaps with anticipated costs for future energy upgrades, reducing incremental investment.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.