[Paper Review] Low Mass WIMP Searches with a Neutrino Experiment: A Proposal for Further MiniBooNE Running
This paper proposes extending the MiniBooNE experiment to search for low-mass WIMPs (10–200 MeV) by running in beam-off-target mode with a 25m absorber deployed, significantly reducing neutrino backgrounds. The method leverages MiniBooNE’s large detector and high proton-on-target rate to probe a previously inaccessible parameter space relevant to the muon g-2 anomaly and thermal relic dark matter, offering a unique, low-cost opportunity for discovery with minimal additional infrastructure.
A proposal submitted to the FNAL PAC is described to search for light sub-GeV WIMP dark matter at MiniBooNE. The possibility to steer the beam past the target and into an absorber leads to a significant reduction in neutrino background, allowing for a sensitive search for elastic scattering of WIMPs off nucleons or electrons in the detector. Dark matter models involving a vector mediator can be probed in a parameter region consistent with the required thermal relic density, and which overlaps the region in which these models can resolve the muon g-2 discrepancy. Estimates of signal significance are presented for various operational modes and parameter points. The experimental approach outlined for applying MiniBooNE to a light WIMP search may also be applicable to other neutrino facilities.
Motivation & Objective
- To search for sub-GeV weakly interacting massive particles (WIMPs) in a parameter space inaccessible to direct detection experiments.
- To exploit MiniBooNE’s existing detector and beam infrastructure for a new physics goal after completion of its primary oscillation program.
- To probe WIMP models that can resolve the muon g-2 discrepancy via a vector mediator, $V_\mu$.
- To achieve sensitivity to light dark matter candidates such as dark photons, axions, and para-photons using the same configuration.
- To enable future dedicated experiments by demonstrating the feasibility of detecting light WIMPs at fixed-target accelerators like those at Fermilab.
Proposed method
- Run MiniBooNE in beam-off-target mode with the proton beam steered past the beryllium target to minimize neutrino production.
- Deploy a 25m absorber downstream of the target to further suppress neutrino backgrounds by absorbing residual beam particles.
- Use the large, electromagnetically sensitive detector (500 m from the target) to search for low-energy nuclear or electron recoils from WIMP scattering.
- Apply timing information to distinguish WIMP signals from residual backgrounds, enhancing signal-to-noise ratio.
- Utilize existing particle identification tools and detector response calibration from prior neutrino oscillation analyses to enable rapid signal extraction.
- Perform reprocessing of data and additional Monte Carlo simulations to derive WIMP sensitivity limits with 2.0 × 10^20 POT.
Experimental results
Research questions
- RQ1Can MiniBooNE achieve sensitivity to low-mass WIMPs (10–200 MeV) using its existing infrastructure and beam configuration?
- RQ2To what extent does deploying the 25m absorber reduce neutrino backgrounds and enhance WIMP detection sensitivity?
- RQ3Is the MiniBooNE detector capable of detecting WIMP signals in the mass range relevant to resolving the muon g-2 discrepancy?
- RQ4What is the projected sensitivity of MiniBooNE to WIMP-nucleon and WIMP-electron scattering cross sections in this mass range?
- RQ5Can the technique of beam-off-target operation with absorber deployment be generalized to future experiments at Fermilab’s Project X?
Key findings
- MiniBooNE can achieve a sensitivity to low-mass WIMPs (10–200 MeV) that overlaps with the parameter space required for thermal relic dark matter abundance.
- The proposed 2.0 × 10^20 POT run in beam-off-target mode with the 25m absorber will significantly reduce neutrino backgrounds, enhancing WIMP detection sensitivity.
- The sensitivity reaches the region where WIMP models with a vector mediator $V_\mu$ can resolve the muon $g-2$ discrepancy.
- The experiment is expected to produce one to two publications on WIMP limits or potential signals, given the high interest and established analysis framework.
- The detector and beamline have demonstrated long-term stability, with spare parts and personnel available to support a two-year run through 2014.
- Remote shifting capabilities and a projected shift burden of ~3 shifts per month for 28 collaborators ensure operational feasibility.
Read this paper
Open the full text in the Nubint reader and ask about any passage as you read.
Read this paper on NubintThis review was generated by AI from the original paper. Please check the paper before citing it.