Skip to main content
QUICK REVIEW

[Paper Review] Representation-Optimal Multi-Robot Motion Planning using Conflict-Based Search

Irving Solis, Read Sandström|arXiv (Cornell University)|Sep 29, 2019
Robotic Path Planning AlgorithmsComputer Science26 references6 citations
TL;DR

This paper introduces CBS-MP, a novel representation-optimal approach for multi-robot motion planning in continuous spaces by extending Conflict-Based Search (CBS) to sampling-based motion planning. It enables efficient, optimal planning for heterogeneous, high-DOF agents by resolving conflicts through incremental roadmap refinement, achieving up to 60× faster planning and superior solution quality compared to decoupled PRM methods, even at scale (32 agents).

ABSTRACT

Multi-Agent Motion Planning (MAMP) is the problem of computing feasible paths for a set of agents given individual start and goal states. Given the hardness of MAMP, most of the research related to multi-agent systems has focused on multi-agent pathfinding (MAPF), which simplifies the problem by assuming a shared discrete representation of the space for all agents. The Conflict-Based Search algorithm (CBS) has proven a tractable means of generating optimal solutions in discrete spaces. However, neither CBS nor other discrete MAPF techniques can be directly applied to solve MAMP problems because of the assumption of the shared discrete representation of the agents' state space. In this work, we solve MAMP problems by adapting the techniques discovered in the MAPF scenario by CBS to the more general problem with heterogeneous agents in a continuous space. We demonstrate the scalability teams of up to 32 agents, demonstrate the ability to handle up to 8 high DOF manipulators, and plan for heterogeneous teams. In all scenarios, our approach plans significantly faster while providing higher quality solutions.

Motivation & Objective

  • Address the limitations of existing multi-agent pathfinding (MAPF) methods that assume a shared discrete space, which fails for heterogeneous or high-DOF agents in continuous spaces.
  • Overcome the scalability and optimality trade-offs in coupled and decoupled multi-agent motion planning (MAMP) approaches by introducing a representation-optimal method.
  • Enable efficient, conflict-free motion planning for heterogeneous teams—such as mobile robots, aerial drones, and high-DOF manipulators—within a unified continuous state space framework.
  • Achieve optimal solutions with respect to individual agent roadmap representations while maintaining computational tractability through conflict resolution in a tree structure.
  • Demonstrate superior performance in planning speed, solution quality, and scalability compared to state-of-the-art decoupled PRM and coupled methods on complex MAMP scenarios.

Proposed method

  • Adapt the Conflict-Based Search (CBS) framework, originally designed for discrete MAPF, to continuous motion planning by applying it to sampled roadmaps instead of grids.
  • Represent each agent’s path as a roadmap (e.g., PRM) and use a conflict tree (CT) to detect inter-agent collisions by discretizing paths into time-sliced segments.
  • Resolve conflicts by recursively expanding the conflict tree and re-planning paths for involved agents using local roadmap modifications, avoiding full joint-space search.
  • Apply uniform time discretization to map continuous paths into time-ordered edge sequences, enabling precise conflict detection between agents’ trajectories.
  • Use a greedy priority mechanism in the conflict tree to guide resolution, favoring paths that minimize roadmap growth and maintain solution quality.
  • Ensure representation-optimality by guaranteeing that the final solution is at least as good as any solution found on the same initial roadmap, outperforming decoupled methods that sample anew.

Experimental results

Research questions

  • RQ1Can Conflict-Based Search (CBS) be generalized from discrete MAPF to continuous, sampling-based multi-agent motion planning (MAMP) while preserving optimality?
  • RQ2How does the proposed CBS-MP method compare in performance and solution quality to decoupled PRM and coupled MAMP approaches in terms of planning time and scalability?
  • RQ3To what extent can CBS-MP handle high-DOF manipulators and heterogeneous robot teams in complex, confined environments?
  • RQ4Does the conflict resolution mechanism in CBS-MP lead to better roadmap efficiency and lower-cost solutions than dynamic roadmap sampling in decoupled methods?
  • RQ5Can CBS-MP maintain high success rates and fast planning times in highly congested scenarios where decoupled methods fail due to path blocking?

Key findings

  • CBS-MP successfully plans for up to 32 agents, while decoupled PRM variants failed to generate solutions for 16 agents within the time limit.
  • For 8 high-DOF manipulators in a tightly coordinated configuration, CBS-MP planned 60× faster on average than the fastest decoupled PRM variant.
  • In heterogeneous scenarios involving a mobile robot, aerial drone, and crane-like manipulator, CBS-MP solved all 100 trials within 1000 seconds, while decoupled PRM succeeded in only 20% of trials.
  • CBS-MP consistently produced lower-cost solutions than decoupled PRM because it leverages existing roadmaps and resolves conflicts without redundant sampling.
  • The method achieved representation-optimality: on the same initial roadmap, CBS-MP never produces a worse solution than decoupled PRM, and often finds better paths with sparser roadmaps.
  • The conflict tree structure enabled efficient conflict resolution even in high-congestion scenarios, where decoupled PRM failed due to greedy path selection blocking shared spaces.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.