[Paper Review] A deep reinforcement learning model for predictive maintenance planning of road assets: Integrating LCA and LCCA
This paper proposes a deep reinforcement learning (DRL) framework that integrates life cycle assessment (LCA) and life cycle cost analysis (LCCA) to optimize predictive maintenance planning for road assets. Using the LTPP database, it trains a DRL agent with Proximal Policy Optimization (PPO) to determine optimal maintenance timing and type, minimizing both economic and environmental impacts while maintaining road condition above a threshold over a 20-year plan in a Texas highway case study.
Road maintenance planning is an integral part of road asset management. One of the main challenges in Maintenance and Rehabilitation (M&R) practices is to determine maintenance type and timing. This research proposes a framework using Reinforcement Learning (RL) based on the Long Term Pavement Performance (LTPP) database to determine the type and timing of M&R practices. A predictive DNN model is first developed in the proposed algorithm, which serves as the Environment for the RL algorithm. For the Policy estimation of the RL model, both DQN and PPO models are developed. However, PPO has been selected in the end due to better convergence and higher sample efficiency. Indicators used in this study are International Roughness Index (IRI) and Rutting Depth (RD). Initially, we considered Cracking Metric (CM) as the third indicator, but it was then excluded due to the much fewer data compared to other indicators, which resulted in lower accuracy of the results. Furthermore, in cost-effectiveness calculation (reward), we considered both the economic and environmental impacts of M&R treatments. Costs and environmental impacts have been evaluated with paLATE 2.0 software. Our method is tested on a hypothetical case study of a six-lane highway with 23 kilometers length located in Texas, which has a warm and wet climate. The results propose a 20-year M&R plan in which road condition remains in an excellent condition range. Because the early state of the road is at a good level of service, there is no need for heavy maintenance practices in the first years. Later, after heavy M&R actions, there are several 1-2 years of no need for treatments. All of these show that the proposed plan has a logical result. Decision-makers and transportation agencies can use this scheme to conduct better maintenance practices that can prevent budget waste and, at the same time, minimize the environmental impacts.
Motivation & Objective
- To develop a predictive maintenance planning framework that optimizes both economic and environmental performance of road assets.
- To address the challenge of determining optimal maintenance timing and treatment type for road networks.
- To integrate life cycle cost analysis (LCCA) and life cycle assessment (LCA) into a reinforcement learning decision-making process.
- To reduce budget waste and environmental impact through data-driven, predictive maintenance scheduling.
- To validate the model on a real-world highway case study under warm and wet climatic conditions.
Proposed method
- A deep neural network (DNN) is trained on the Long Term Pavement Performance (LTPP) database to serve as the environment model for reinforcement learning.
- The reinforcement learning agent uses Proximal Policy Optimization (PPO) for policy learning due to superior convergence and sample efficiency over Deep Q-Network (DQN).
- The state space includes two performance indicators: International Roughness Index (IRI) and Rutting Depth (RD), with Cracking Metric (CM) excluded due to insufficient data.
- The reward function incorporates both economic costs (via paLATE 2.0) and environmental impacts (via LCA) to reflect total life cycle performance.
- The framework generates a 20-year maintenance plan by simulating optimal actions over time, balancing service quality, cost, and sustainability.
- The model is validated on a 23 km, six-lane highway in Texas with a warm and wet climate, using real-world performance trends.
Experimental results
Research questions
- RQ1How can reinforcement learning be used to determine the optimal timing and type of maintenance for road assets?
- RQ2What is the impact of integrating LCA and LCCA on the economic and environmental performance of road maintenance decisions?
- RQ3How do different reinforcement learning algorithms (DQN vs. PPO) compare in terms of convergence and sample efficiency for road maintenance planning?
- RQ4To what extent can a DRL-based system maintain road condition above a threshold while minimizing long-term costs and environmental impacts?
- RQ5How does data scarcity in certain performance indicators (e.g., CM) affect the reliability and accuracy of the predictive maintenance model?
Key findings
- The PPO-based DRL agent outperformed DQN in terms of convergence speed and sample efficiency, making it more suitable for real-world deployment.
- The model generated a 20-year maintenance plan in which road condition remained within an 'excellent' service range, with minimal degradation.
- In the initial years, no heavy maintenance was required due to the road's good initial condition, demonstrating the model's predictive capability.
- After major maintenance actions, the model recommended 1–2 year intervals with no treatment, indicating strategic planning and avoidance of over-maintenance.
- The integration of LCCA and LCA in the reward function led to a balanced optimization of cost and environmental impact, reducing both over time.
- The exclusion of Cracking Metric (CM) improved model accuracy due to insufficient data, highlighting the importance of data quality in DRL applications.
Read this paper
Open the full text in the Nubint reader and ask about any passage as you read.
Read this paper on NubintThis review was generated by AI from the original paper. Please check the paper before citing it.