QUICK REVIEW

[Paper Review] A life cycle assessment of the ISIS-II neutron and muon source

H. M. Wakeling|arXiv (Cornell University)|Jun 6, 2024
Muon and positron interactions and applicationsEngineering1 citations
TL;DR

This paper presents a simplified life cycle assessment (LCA) of the proposed ISIS-II neutron and muon source, focusing on environmental impacts from construction and operation of its 180 MeV linear accelerator. Using OpenLCA and the Idemat database, it finds that construction—particularly buildings and shielding—contributes significantly more to global warming impact (GWI) than the accelerator components, with construction and operational GWI on the same order of magnitude, highlighting buildings and shielding as key hotspots for mitigation.

ABSTRACT

The ISIS-II Neutron and Muon source is the proposed next generation of, and successor to, the ISIS Neutron and Muon Source based at the Rutherford Appleton Laboratory in the United Kingdom. Anticipated to start construction in 2031, the ISIS-II project presents a unique opportunity to incorporate environmental sustainability practices from its inception. A Life Cycle Assessment (LCA) will examine the environmental impacts associated with each of the ISIS-II design options across the stages of the ISIS-II lifecycle, encompassing construction, operation, and eventual decommissioning. This proactive approach will assess all potential areas of environmental impact and seek to identify strategies for minimizing and mitigating negative impacts, wherever feasible. This presentation will provide insights into the process and first results of the LCA of the entirety of the ISIS-II project.

Motivation & Objective

  • To assess the environmental impact of the proposed ISIS-II neutron and muon source across its full life cycle.
  • To identify key environmental hotspots in the design phase to guide sustainable development.
  • To inform the feasibility and optioneering process with data-driven sustainability insights.
  • To support the UK’s net-zero goals by embedding environmental impact reduction from the outset of a major scientific facility.

Proposed method

  • Conducting a simplified, iterative LCA using the four-step ISO 14040 framework: goal & scope, inventory analysis, LCIA, and interpretation.
  • Defining the functional unit as one 60-year operational ISIS-II facility with 70 years of decommissioning.
  • Using OpenLCA v2.0.3 and the Idemat LCA database for initial data modeling, with planned migration to Ecoinvent for higher accuracy.
  • Applying the ReCiPe:2016 LCIA method with midpoint (H) impact factors to evaluate global warming impact (GWI).
  • Employing Monte Carlo simulation with log-normal distributions to assess uncertainty, using data quality scores from the EcoInvent system.
  • Estimating inventory data with tiered uncertainty levels: 0–5% for measured data, up to 80% for order-of-magnitude estimates.

Experimental results

Research questions

  • RQ1What are the primary environmental impact contributors across the life cycle of the proposed ISIS-II facility?
  • RQ2How do construction and operational phases compare in terms of global warming impact (GWI)?
  • RQ3Which facility components—especially buildings, shielding, and accelerator structures—contribute most to environmental impact?
  • RQ4To what extent can uncertainty in material and energy estimates affect LCA outcomes for a still-undesigned facility?
  • RQ5How can LCA inform sustainable design decisions during the feasibility and optioneering phase of a large-scale particle accelerator?

Key findings

  • Construction of the 180 MeV LINAC section contributes approximately 20 kt CO2 eq to global warming impact (GWI), with a high degree of uncertainty.
  • Operational energy use over the facility’s lifetime is estimated at around 40 kt CO2 eq, placing it on the same order of magnitude as construction impacts.
  • Buildings and shielding together account for 95% of the construction-phase GWI, with buildings alone contributing 53% and shielding 42% of the total.
  • The FETS, DTL, and SDTL components collectively contribute less than 5% of the total construction GWI, indicating that structural elements dominate environmental impact.
  • The study identifies buildings and shielding as the primary environmental hotspots, suggesting that design optimization in these areas offers the highest potential for impact reduction.
  • The results underscore the importance of early-stage LCA in large scientific facilities, with future work expected to reduce uncertainty and expand to include decommissioning (C) and full facility scope.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.