Skip to main content
QUICK REVIEW

[Paper Review] A note on scheduling with low rank processing times

Lin Chen, Deshi Ye|arXiv (Cornell University)|Jun 17, 2013
Scheduling and Optimization AlgorithmsEngineering7 references4 citations
TL;DR

This paper improves the inapproximability bounds for the minimum makespan scheduling problem with low-rank processing time matrices. By reducing from a specialized 3D matching variant and refining job processing time constructions, the authors prove that LRS(4) is NP-hard to approximate within a factor of $3/2 - \epsilon$, and LRS(3) is APX-hard, tightening prior results that required rank 7 for $3/2$-approximation hardness and rank 4 for APX-hardness.

ABSTRACT

We consider the classical minimum makespan scheduling problem, where the processing time of job $j$ on machine $i$ is $p_{ij}$, and the matrix $P=(p_{ij})_{m imes n}$ is of a low rank. It is proved in (Bhaskara et al., SODA 2013) that rank 7 scheduling is NP-hard to approximate to a factor of $3/2-ε$, and rank 4 scheduling is APX-hard (NP-hard to approximate within a factor of $1.03-ε$). We improve this result by showing that rank 4 scheduling is already NP-hard to approximate within a factor of $3/2-ε$, and meanwhile rank 3 scheduling is APX-hard.

Motivation & Objective

  • To close the gap in inapproximability results for scheduling with low-rank processing time matrices.
  • To show that rank 4 scheduling is already NP-hard to approximate within $3/2 - \epsilon$, improving on prior work that required rank 7.
  • To establish APX-hardness for rank 3 scheduling, tightening the threshold for intractability.
  • To refine reductions from combinatorial problems by using a specialized 3D matching variant and delicate job time design.

Proposed method

  • Reduction from a restricted variant of the 3-dimensional matching problem (3DM′), where elements and matches are structured with specific symmetries and fixed match sets.
  • Design of job processing times using a D-dimensional vector model where $p_{ij} = u_i \cdot v_j^T$, with $D=4$ for the main result and $D=3$ for APX-hardness.
  • Construction of truth assignment and clause machines to simulate variable assignments and clause satisfaction in a 3SAT instance.
  • Use of 'huge jobs' and 'dummy jobs' to enforce load constraints and ensure only valid assignments achieve balanced schedules.
  • Leveraging the structure of $T_1$ and $T_2$ matches to simulate logical constraints in the 3SAT reduction.
  • Proving that every machine must be 'truth benevolent'—all non-huge jobs on a machine must have consistent truth values—thereby linking machine load to logical consistency.

Experimental results

Research questions

  • RQ1Is LRS(4) NP-hard to approximate within a factor of $3/2 - \epsilon$?
  • RQ2Can the inapproximability threshold for $3/2$-approximation be lowered from rank 7 to rank 4?
  • RQ3Is LRS(3) APX-hard, or does it admit a PTAS?
  • RQ4Can a more refined reduction from a variant of 3DM′ achieve stronger inapproximability results than prior work?
  • RQ5Does the structure of the processing time matrix with low rank fundamentally affect the approximability of the makespan scheduling problem?

Key findings

  • LRS(4) is NP-hard to approximate within a factor of $3/2 - \epsilon$ for any $\epsilon > 0$, improving upon the prior result that required rank 7 for this hardness.
  • LRS(3) is APX-hard, meaning it is NP-hard to approximate within a factor of $1.03 - \epsilon$, which strengthens the prior result that required rank 4 for APX-hardness.
  • The reduction for LRS(4) uses a specialized 3DM′ variant with fixed $T_2$ matches and structured $T_1$ matches, enabling tighter control over job assignments.
  • The proof establishes that all machines must be 'truth benevolent', meaning all non-huge jobs on a machine must be consistently true or false, linking schedule balance to logical consistency.
  • The construction ensures that a valid schedule exists only if the underlying 3SAT instance is satisfiable, and the makespan is bounded by $r + O(\epsilon)$ only when the assignment is consistent.
  • The results close the gap in the known inapproximability frontier for low-rank scheduling, showing that even rank 3 and 4 matrices yield strong hardness results.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.