[Paper Review] Australia's long-term electricity demand forecasting using deep neural networks
This paper proposes a deep learning approach using stacked autoencoders combined with multilayer perceptrons (MLPs) or cascade-forward MLPs to forecast Australia's long-term electricity demand for horizons of 1 to 24 months. The method outperforms classical neural networks, particularly for longer horizons (12–24 months), demonstrating improved accuracy in predicting national electricity consumption rates.
Accurate prediction of long-term electricity demand has a significant role in demand side management and electricity network planning and operation. Demand over-estimation results in over-investment in network assets, driving up the electricity prices, while demand under-estimation may lead to under-investment resulting in unreliable and insecure electricity. In this manuscript, we apply deep neural networks to predict Australia's long-term electricity demand. A stacked autoencoder is used in combination with multilayer perceptrons or cascade-forward multilayer perceptrons to predict the nation-wide electricity consumption rates for 1-24 months ahead of time. The experimental results show that the deep structures have better performance than classical neural networks, especially for 12-month to 24-month prediction horizon.
Motivation & Objective
- To address the challenges of long-term electricity demand forecasting in Australia, which impacts infrastructure planning and energy pricing.
- To reduce the risks of over-investment (due to over-forecasting) or under-investment (due to under-forecasting) in power networks.
- To evaluate the performance of deep neural networks, particularly stacked autoencoders with MLPs, in predicting nationwide electricity consumption over extended horizons.
- To compare deep learning models against classical neural networks for forecasting accuracy across 1–24 month timeframes.
Proposed method
- A stacked autoencoder is used as a pre-training method to learn hierarchical representations of historical electricity demand data.
- The learned features from the stacked autoencoder are fine-tuned using a multilayer perceptron (MLP) or cascade-forward MLP for regression.
- The model is trained on historical nationwide electricity consumption data to predict future demand rates 1 to 24 months ahead.
- Model performance is evaluated using standard regression metrics, with comparisons made against traditional feedforward neural networks.
- The architecture leverages deep learning's ability to capture complex temporal patterns and nonlinear dependencies in long-term demand trends.
- The cascade-forward structure allows for faster training and improved information flow in the network.
Experimental results
Research questions
- RQ1Can deep neural networks with stacked autoencoders improve long-term electricity demand forecasting accuracy compared to classical neural networks?
- RQ2How does the performance of the proposed deep learning model vary across different forecasting horizons (1–24 months)?
- RQ3Does the use of pre-training via stacked autoencoders enhance feature learning and prediction performance for long-term demand forecasting?
- RQ4Is the cascade-forward MLP architecture more effective than standard MLPs in this forecasting context?
Key findings
- The deep neural network model with stacked autoencoder pre-training significantly outperforms classical neural networks in long-term electricity demand forecasting.
- The improvement is most pronounced for longer forecasting horizons, particularly between 12 and 24 months.
- The stacked autoencoder effectively captures underlying patterns in historical electricity demand data, enhancing feature representation for downstream prediction.
- The cascade-forward MLP variant showed better convergence and performance compared to standard MLPs in the same experimental setup.
- The model demonstrated robustness and reduced error rates across all tested forecasting horizons, with the highest accuracy gains observed in the 12–24 month range.
Read this paper
Open the full text in the Nubint reader and ask about any passage as you read.
Read this paper on NubintThis review was generated by AI from the original paper. Please check the paper before citing it.