This paper proposes transforming CERN's Low Energy Ion Ring (LEIR) into BioLEIR, a biomedical research facility providing high-quality light ion beams for radiobiology and radiation instrument development. The study confirms technical feasibility, identifies beam parameters and infrastructure needs, and concludes BioLEIR could be operational by 2021 if funded and approved by mid-2017.
The biomedical community asked CERN to investigate the possibility to transform the Low Energy Ion Ring (LEIR) accelerator into a multidisciplinary, biomedical research facility (BioLEIR) that could provide ample, high-quality beams of a range of light ions suitable for clinically oriented fundamental research on cell cultures and for radiation instrumentation development. BioLEIR would be operated when LEIR is not providing heavy ions for the CERN physics programme. The study group was mandated to write a Feasibility Study Report, using high-level engineering estimates based on previous experience, with the aim to: - collect the requirements for such a facility from the biomedical community in close collaboration with the International Strategy Committee for CERN Medical Applications; - determine a coherent set of beam parameters, based on the requirements; - explore whether the beam requirements can be met throughout the facility, from the source to the biomedical end-stations; - perform a feasibility study of the facility, taking into consideration the overall CERN schedules and programmes; - favour simplicity and robustness of the facility design, while minimizing the cost of maintenance and operation; - establish a high-level costing of material and personnel needed for project implementation; - describe the preferred installation scenario; - perform a high-level risk analysis for the project; - identify the areas of potential difficulty, and the required R&D should the study go ahead and become a project.
Motivation & Objective
- Address the biomedical community's need for a dedicated, high-quality light ion beam facility for in vitro radiobiology research.
- Assess the technical and operational feasibility of repurposing LEIR for biomedical applications without disrupting CERN's core physics programme.
- Define beam parameters (ion species, energy, intensity) that meet biomedical research requirements while ensuring compatibility with existing CERN infrastructure.
- Establish a high-level cost estimate, installation scenario, and risk analysis for project implementation.
- Identify R&D needs and potential technical challenges to support future project decision-making.
Proposed method
- Conduct a feasibility study using high-level engineering estimates based on CERN’s prior accelerator experience.
- Collect and consolidate beam requirements from the biomedical community in collaboration with the International Strategy Committee for CERN Medical Applications.
- Map beam parameters from source to end-station, evaluating transport, focusing, and beam loss constraints.
- Assess integration into CERN’s Long Shutdown (LS2) schedule, prioritizing minimal disruption to existing heavy-ion operations.
- Propose a modular, robust, and cost-effective design emphasizing simplicity and low maintenance.
- Evaluate potential control irradiation sources (e.g., 137-Cs, linacs) for standardized radiobiological RBE studies.
Experimental results
Research questions
- RQ1Can the existing LEIR infrastructure support a new biomedical beamline with required beam parameters for radiobiology?
- RQ2What are the optimal beam parameters (ion species, energy, current) for fundamental radiobiological research and instrument development?
- RQ3Is there a viable, low-risk path to install and commission BioLEIR within CERN’s Long Shutdown 2 (LS2) timeline?
- RQ4What are the key technical, financial, and operational challenges in repurposing LEIR for biomedical use?
- RQ5What control irradiation sources are most suitable for standardized, clinically relevant radiobiological RBE measurements?
Key findings
- No technical show-stoppers were identified for the BioLEIR project, confirming its overall technical feasibility.
- BioLEIR could be operational by 2021 if a decision is made and funding is secured by mid-2017, aligning with CERN’s LS2 schedule.
- A minimum of 3.5 years is required for design, procurement, installation, and commissioning after project approval.
- If the LS2 window is missed, the earliest possible operation would be after LS3 in 2026, based on current CERN schedules.
- A 137-Caesium source in a vertical configuration and a megavoltage electron linac are recommended for standardized control irradiations.
- Parasitic use of the existing GBAR 9 MeV electron linac in building 393 is considered a feasible option for control irradiation.