[Paper Review] Charging station location planning for electric trucks under demand and grid uncertainty
The paper develops a multi-period, two-stage stochastic CSLP for long-haul BEHDVs, explicitly modeling uncertainty in both freight demand and local grid capacity, solved via an integer-L-shaped decomposition within a branch-and-cut framework. It demonstrates substantial value of stochastic modeling and provides managerial insights on deployment under grid constraints.
Decarbonizing long-haul freight requires large-scale deployment of high-power charging infrastructure. This paper studies a multi-period charging station location problem that determines where and when to deploy charging capacity for battery-electric heavy-duty vehicles under uncertain future demand and local grid capacity availability. The problem is formulated as a two-stage stochastic mixed-integer program that maximizes covered electric freight flow. Feasible truck routes are generated a priori using a resource-constrained label-setting algorithm that enforces range limitations and driving-break regulations. To solve large-scale instances, an integer L-shaped decomposition method embedded in a branch-and-cut framework and accelerated by a deterministic warm start is implemented. Computational experiments are conducted on a nationwide Norwegian case study based on real candidate locations provided by a charging station operator. The approach solves instances intractable for a monolithic formulation and achieves near-optimal solutions within practical runtimes. For larger networks, the value of the stochastic solution is substantial, highlighting the importance of explicitly modeling uncertainty in long-term infrastructure planning. Optimal investments prioritize major freight corridors in early periods and subsequently reinforce and expand the network. Grid capacity constraints discourage large, concentrated stations and shift deployments toward more distributed layouts. Covered demand increases rapidly at low budget levels but exhibits diminishing returns as the network approaches saturation.
Motivation & Objective
- Motivate decarbonization of long-haul freight through strategic charging infrastructure deployment.
- Model a multi-period CSLP that jointly considers demand growth and grid capacity uncertainty.
- Link strategic investments (location and capacity) to operational feasibility via feasible BEHDV routing.
- Enable scalable solution for large networks using scenario-based stochastic programming and decomposition.
- Provide managerial insights on how grid limits and budget influence deployment patterns.
Proposed method
- Formulate a multi-period, two-stage stochastic mixed-integer program that maximizes expected served BEHDV demand.
- Represent uncertainty with scenario-based future demand and grid capacity realizations.
- Generate operationally feasible BEHDV paths for OD pairs using a resource-constrained, label-setting algorithm.
- Solve with an integer L-shaped decomposition inside a branch-and-cut framework, aided by a deterministic warm start.
- Constrain investments by site preparation, charger installation costs, budgets, and local grid capacities across time and scenarios.
Experimental results
Research questions
- RQ1How should charging stations be located and when should they be prepared or expanded to maximize served long-haul BEHDV demand under uncertain demand and grid capacity?
- RQ2What is the value of explicitly modeling grid capacity uncertainty in long-term CSLP investments?
- RQ3How do grid constraints affect the spatial layout (distributed vs concentrated) of charging infrastructure over time?
- RQ4What are the operational implications of multi-path routing and charger utilization on network planning under uncertainty?
Key findings
- Optimal investments prioritize major freight corridors in early periods and subsequently reinforce and expand the network.
- Grid capacity constraints discourage large, concentrated stations and shift deployments toward distributed layouts.
- The value of the stochastic solution increases with instance size, highlighting benefits of modeling uncertainty.
- Coverage gains are rapid at low budgets but exhibit diminishing returns as the network saturates.
- For larger networks, explicitly modeling both demand and grid uncertainty significantly impacts investment timing and location decisions.
Read this paper
Open the full text in the Nubint reader and ask about any passage as you read.