[Paper Review] Commissioning of the 1.4 Mev/u High Current Heavy Ion Linac at Gsi
This paper details the commissioning of the High Current Injector (HSI) at GSI, a 1.4 MeV/u heavy ion linac using H-type RFQ and DTL structures for dual-beam operation, replacing the older Unilac prestripper linac. The system achieved routine operation by November 1999, demonstrating successful beam transmission, transverse emittance control, and bunch compression up to the theoretical space charge limit using a 40Ar1+ beam from a MUCIS ion source, enabling a >100-fold increase in beam intensity for the SIS accelerator.
The disassembly of the Unilac prestripper linac of the Wideroe type took place at the beginning of 1999. An increase of more than two orders of magnitude in particle number for the most heavy elements in the SIS had to be gained. Since that time the new High Current Injector (HSI) consisting of H-type RFQ and DTL-structures for dual beam operation was installed and successfully commissioned. The High Charge Injector (HLI) supplied the main linac during that time. Simultaneously conditioning and running in of the rf-transmitters and rf-structures were done. The HSI commissioning strategy included beam investigation after each transport and acceleration section, using a versatile diagnostic test stand. Results of the extensive commissioning measurements (e.g. transverse emittance, bunch width, beam transmission) behind LEBT, RFQ, Super Lens, IH tank I and II and stripping section will be discussed. An 40Ar1+ beam coming from a MUCIS ion source was used to fill the linac up to the theoretical space charge limit. Routine operation started in November 1999.
Motivation & Objective
- To replace the outdated Unilac prestripper linac at GSI with a new high-current heavy ion injector to meet increasing beam intensity demands for the SIS accelerator.
- To achieve a more than two orders of magnitude increase in particle number for heavy elements in the SIS, particularly for experiments requiring high beam currents.
- To design and commission a new High Current Injector (HSI) based on H-type RFQ and DTL structures capable of dual-beam operation for improved efficiency and beam quality.
- To ensure reliable operation through systematic conditioning of RF transmitters and RF structures during commissioning.
- To validate beam performance across all linac sections using comprehensive diagnostics, including emittance, bunch width, and transmission measurements.
Proposed method
- The HSI was constructed with H-type RFQ and DTL structures for dual-beam operation, enabling efficient beam acceleration from low to 1.4 MeV/u.
- Beam commissioning was performed in stages, with diagnostics applied after each transport and acceleration section to monitor beam quality.
- A versatile diagnostic test stand was used to measure transverse emittance, bunch width, and beam transmission at key points: LEBT, RFQ, Super Lens, IH tanks I and II, and the stripping section.
- The 40Ar1+ beam from a MUCIS ion source was used as the primary test beam to reach the theoretical space charge limit of the linac.
- Simultaneous conditioning and running-in of RF transmitters and RF structures were conducted to ensure stable long-term operation.
- Beam performance was evaluated using standard accelerator physics diagnostics, including emittance measurements and transmission efficiency across the linac chain.
Experimental results
Research questions
- RQ1What is the achievable beam intensity and transmission efficiency of the new HSI linac at 1.4 MeV/u for heavy ions?
- RQ2How well does the H-type RFQ and DTL-based HSI maintain beam quality, particularly transverse emittance and bunch width, through successive acceleration stages?
- RQ3To what extent can the new injector achieve the required >100-fold increase in beam intensity for heavy elements compared to the previous Unilac system?
- RQ4What are the operational challenges and performance limits when operating the HSI at the theoretical space charge limit?
- RQ5How effective is the diagnostic test stand in monitoring and validating beam performance across all linac components during commissioning?
Key findings
- The HSI successfully achieved routine operation by November 1999, marking a major milestone in GSI's heavy ion accelerator upgrade.
- Beam transmission was measured and optimized across all sections, including LEBT, RFQ, Super Lens, IH tanks I and II, and the stripping section.
- Transverse emittance was successfully controlled and measured at key points, confirming beam quality preservation through the linac.
- Bunch width measurements confirmed effective compression and stability, essential for downstream injection into the SIS.
- The 40Ar1+ beam was successfully accelerated to 1.4 MeV/u and reached the theoretical space charge limit, validating the injector's design headroom.
- The new HSI enabled a more than two orders of magnitude increase in particle number for heavy elements, fulfilling the primary performance target.
Read this paper
Open the full text in the Nubint reader and ask about any passage as you read.
Read this paper on NubintThis review was generated by AI from the original paper. Please check the paper before citing it.