[Paper Review] Deadline-Aware, Energy-Efficient Control of Domestic Immersion Hot Water Heater
The paper develops a deadline-aware control problem for a domestic immersion heater and compares a PPO policy, MCTS planner, and a bang-bang baseline under identical physics, showing PPO achieves the lowest energy use across horizons.
Typical domestic immersion water heater systems are often operated continuously during winter, heating quickly rather than efficiently and ignoring predictable demand windows and ambient losses. We study deadline-aware control, where the aim is to reach a target temperature at a specified time while minimising energy consumption. We introduce an efficient Gymnasium environment that models an immersion hot water heater with first-order thermal losses and discrete on and off actions of 0 W and 6000 W applied every 120 seconds. Methods include a time-optimal bang-bang baseline, a zero-shot Monte Carlo Tree Search planner, and a Proximal Policy Optimisation policy. We report total energy consumption in watt-hours under identical physical dynamics. Across sweeps of initial temperature from 10 to 30 degrees Celsius, deadline from 30 to 90 steps, and target temperature from 40 to 80 degrees Celsius, PPO achieves the most energy-efficient performance at a 60-step horizon of 2 hours, using 3.23 kilowatt-hours, compared to 4.37 to 10.45 kilowatt-hours for bang-bang control and 4.18 to 6.46 kilowatt-hours for MCTS. This corresponds to energy savings of 26 percent at 30 steps and 69 percent at 90 steps. In a representative trajectory with a 50 kg water mass, 20 degrees Celsius ambient temperature, and a 60 degrees Celsius target, PPO consumes 54 percent less energy than bang-bang control and 33 percent less than MCTS. These results show that learned deadline-aware control reduces energy consumption under identical physical assumptions, while planners provide partial savings without training and learned policies offer near-zero inference cost once trained.
Motivation & Objective
- Motivate reducing energy use in domestic hot-water heating by aligning heat delivery with predictable demand deadlines.
- Create a transparent, reproducible simulation environment with first-order thermal dynamics for fair method comparison.
- Evaluate learning-based policy (PPO) against model-based planning (MCTS) and a time-optimal bang-bang baseline under fixed physics and timing.
- Quantify energy savings across initial temperatures, deadlines, and target temperatures to reveal deployment trade-offs.
Proposed method
- Model a single-tank immersion heater with first-order losses and discrete on/off actuation at 0 or 6000 W every 120 seconds.
- Use a lightweight Gymnasium environment with fixed parameters to ensure identical physics across controllers.
- Compare a time-optimal bang-bang baseline, a zero-shot Monte Carlo Tree Search planner, and a Proximal Policy Optimization (PPO) agent.
- Train PPO for 2.5 million environment steps and evaluate performance against MCTS and bang-bang across sweeps of initial temperature, deadline, and target temperature.
Experimental results
Research questions
- RQ1Can a deadline-aware control strategy reduce energy use while meeting a target temperature by a specified time?
- RQ2How do learned policies (PPO) compare to model-based planning (MCTS) and simple bang-bang control under identical physics?
- RQ3What are the energy savings and behavior differences (e.g., overshoot, timing) across varying initial conditions, deadlines, and targets?
- RQ4What deployment trade-offs exist between planning-based and policy-based approaches for device-level water heating?
Key findings
- PPO achieves the lowest energy across scenarios, forming the energy Pareto frontier with tight dispersion.
- In a representative 60-step horizon case, PPO uses 3.23 kWh, while bang-bang uses 4.37–10.45 kWh and MCTS uses 4.18–6.46 kWh, giving 26% and 69% savings at 30 and 90 steps respectively.
- PPO delivers 54% energy savings versus bang-bang and 33% versus MCTS for a representative trajectory (50 kg, 20 C ambient, 60 C target).
- Zero-shot MCTS provides partial savings over bang-bang but shows more terminal-temperature variance and occasional overshoot/undershoot.
- Bang-bang is least energy-efficient, heating at full power from the start and achieving target only with high energy cost; MCTS outperforms bang-bang but is outperformed by PPO.
Read this paper
Open the full text in the Nubint reader and ask about any passage as you read.
Read this paper on NubintThis review was generated by AI from the original paper. Please check the paper before citing it.