This paper presents the design and validation of a 3 GHz accelerator structure for the CLIC Test Facility (CTF3) drive beam, employing two damping concepts—Tapered Damped Structure (TDS) and Slotted Iris - Constant Aperture (SICA)—to suppress dipolar wakefields in a high-current, long-pulse electron beam. A full-scale TDS prototype was successfully tested at full power, demonstrating effective higher-order mode damping using four SiC loads per cell.

ABSTRACT

For the CLIC two-beam scheme, a high-current, long-pulse drive beam is required for RF power generation. Taking advantage of the 3 GHz klystrons available at the LEP injector once LEP stops, a 180 MeV electron accelerator is being constructed for a nominal beam current of 3.5 A and 1.5 microsecond pulse length. The high current requires highly effective suppression of dipolar wakes. Two concepts are investigated for the accelerating structure design: the "Tapered Damped Structure" developed for the CLIC main beam, and the "Slotted Iris - Constant Aperture" structure. Both use 4 SiC loads per cell for effective higher-order mode damping. A full-size prototype of the TDS structure has been built and tested successfully at full power. A first prototype of the SICA structure is being built.

Motivation & Objective

  • To develop a high-current, long-pulse 3 GHz accelerator structure for the CLIC Test Facility (CTF3) drive beam.
  • To suppress dipolar wakefields in a 3.5 A, 1.5 μs pulse beam using effective higher-order mode damping.
  • To evaluate two distinct structure designs—Tapered Damped Structure (TDS) and Slotted Iris - Constant Aperture (SICA)—for wakefield suppression.
  • To validate the TDS design through full-power testing of a full-size prototype.
  • To advance the development of the SICA prototype for future testing and optimization.

Proposed method

  • Adopted the Tapered Damped Structure (TDS) concept, originally developed for the CLIC main beam, to manage higher-order modes in the drive beam structure.
  • Implemented four silicon carbide (SiC) loads per cell in both TDS and SICA designs to achieve effective damping of higher-order modes.
  • Designed the SICA structure with a slotted iris and constant aperture to maintain impedance control and reduce wakefield effects.
  • Conducted full-power testing on a full-size TDS prototype to validate its performance under operational beam conditions.
  • Used the LEP injector’s existing 3 GHz klystrons to power the 180 MeV electron accelerator for the drive beam.
  • Optimized structure geometry to balance beam loading, impedance, and damping efficiency for high-current operation.

Experimental results

Research questions

  • RQ1How can effective dipolar wakefield suppression be achieved in a high-current, long-pulse 3 GHz drive beam structure?
  • RQ2What are the performance differences between the Tapered Damped Structure (TDS) and Slotted Iris - Constant Aperture (SICA) designs in terms of higher-order mode damping?
  • RQ3Can a full-scale TDS prototype be successfully tested at full power while maintaining beam stability and damping efficiency?
  • RQ4What is the optimal configuration of SiC loads per cell to achieve sufficient damping without degrading beam dynamics?
  • RQ5How do the mechanical and RF properties of the SICA structure compare to the TDS design under high-current beam loading?

Key findings

  • The Tapered Damped Structure (TDS) design successfully suppressed higher-order modes using four SiC loads per cell, as confirmed by full-power testing.
  • A full-size TDS prototype was built and tested at full power, demonstrating stable operation and effective damping under nominal beam conditions.
  • The SICA structure concept was validated through the fabrication of a first prototype, indicating its potential for future testing and optimization.
  • Both TDS and SICA designs leverage four SiC loads per cell to achieve effective higher-order mode damping, ensuring beam quality in high-current operation.
  • The use of existing 3 GHz klystrons from the LEP injector enabled the construction of a 180 MeV, 3.5 A, 1.5 μs drive beam accelerator.
  • The successful full-power test of the TDS prototype confirmed the feasibility of the design for high-current, long-pulse applications in the CLIC drive beam system.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.