Skip to main content
QUICK REVIEW

[Paper Review] Distributed Allocation and Scheduling of Tasks with Cross-Schedule Dependencies for Heterogeneous Multi-Robot Teams

Barbara Arbanas, Tamara Petrović|arXiv (Cornell University)|Sep 7, 2021
Robotic Path Planning AlgorithmsComputer Science44 references6 citations
TL;DR

This paper proposes a distributed, metaheuristic-based task allocation and scheduling algorithm for heterogeneous multi-robot teams with cross-schedule dependencies, modeling the problem as a variant of the Vehicle Routing Problem (VRP) using a distributed evolutionary computation approach (CBM-pop). The method achieves faster computation and better scalability than state-of-the-art auction-based methods, with a 13.23% average reduction in CPU time and near-optimal solution quality in both benchmark and real-world greenhouse use cases.

ABSTRACT

To enable safe and efficient use of multi-robot systems in everyday life, a robust and fast method for coordinating their actions must be developed. In this paper, we present a distributed task allocation and scheduling algorithm for missions where the tasks of different robots are tightly coupled with temporal and precedence constraints. The approach is based on representing the problem as a variant of the vehicle routing problem, and the solution is found using a distributed metaheuristic algorithm based on evolutionary computation (CBM-pop). Such an approach allows a fast and near-optimal allocation and can therefore be used for online replanning in case of task changes. Simulation results show that the approach has better computational speed and scalability without loss of optimality compared to the state-of-the-art distributed methods. An application of the planning procedure to a practical use case of a greenhouse maintained by a multi-robot system is given.

Motivation & Objective

  • To develop a robust, fast, and scalable distributed task allocation and scheduling method for heterogeneous multi-robot systems with tight temporal and precedence constraints.
  • To address cross-schedule dependencies (XD), including precedence and transitional constraints, in a way that enables coordinated planning across multiple robots.
  • To enable online replanning in dynamic environments by ensuring low computational overhead and fast convergence.
  • To provide a solution that avoids reliance on a central coordinator, enhancing system robustness and fault tolerance.
  • To validate the approach on both synthetic benchmarks and a real-world greenhouse automation use case.

Proposed method

  • The problem is modeled as a variant of the Capacitated Multi-Depot Vehicle Routing Problem (CVRP), enabling application of established VRP optimization techniques.
  • A distributed metaheuristic algorithm based on evolutionary computation (CBM-pop) is employed, incorporating knowledge sharing and mimetism to improve convergence.
  • Each robot maintains its own partial solution and iteratively improves it through local search and information exchange with neighbors.
  • The algorithm handles precedence constraints by encoding task orderings within the solution representation and enforcing them during fitness evaluation.
  • Transitional dependencies are modeled through time windows and setup times, integrated into the solution cost function.
  • The approach is tested on a benchmark dataset for XD[ST-SR-TA] tasks and compared against a state-of-the-art auction-based method.

Experimental results

Research questions

  • RQ1Can a distributed, metaheuristic approach achieve near-optimal task allocation and scheduling for heterogeneous multi-robot teams with cross-schedule dependencies?
  • RQ2How does the proposed method compare to centralized or auction-based approaches in terms of computational speed and solution quality?
  • RQ3To what extent can the method scale with increasing problem size and complexity?
  • RQ4Can the method support online replanning in response to dynamic changes such as task additions or robot failures?
  • RQ5How effective is the approach in real-world applications involving temporal and precedence constraints?

Key findings

  • The proposed algorithm achieved a 13.23% average reduction in CPU time compared to the state-of-the-art auction-based method on benchmark problems.
  • The solution quality was nearly identical, with only a 0.59% average improvement in makespan and 0.76% in total cost.
  • The method demonstrated superior scalability and computational speed, particularly as problem complexity increased.
  • The distributed nature of the algorithm eliminated reliance on a central coordinator, improving robustness and fault tolerance.
  • The approach successfully generated a valid, executable schedule for a real-world greenhouse use case involving 12 robots and 30 tasks with precedence constraints.
  • An animated visualization of the schedule execution is publicly available, confirming the feasibility and correctness of the generated plans.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.