Skip to main content
QUICK REVIEW

[Paper Review] Installation Status of the Electron Beam Profiler for the Fermilab Main Injector

R. Thurman-Keup, M. A. G. Álvarez|arXiv (Cornell University)|Nov 6, 2015
Particle accelerators and beam dynamicsEngineering1 citations
TL;DR

This paper details the installation and characterization of an electron beam profiler (EBP) at Fermilab's Main Injector to non-invasively measure high-intensity proton beam transverse profiles. Utilizing electromagnetic deflection of a low-energy electron beam (15 keV) by the proton beam's space charge, the system employs electrostatic deflection, optical transition radiation (OTR) calibration, and phosphor screen imaging; simulations and test results confirm sub-2% profile reconstruction accuracy, with mumetal shielding successfully mitigating external magnetic fields.

ABSTRACT

The planned neutrino program at Fermilab requires large proton beam intensities in excess of 2 MW. Measuring the transverse profiles of these high intensity beams is challenging and often depends on non-invasive techniques. One such technique involves measuring the deflection of a probe beam of electrons with a trajectory perpendicular to the proton beam. A device such as this is already in use at the Spallation Neutron Source at ORNL and the installation of a similar device is underway in the Main Injector at Fermilab. The present installation status of the electron beam profiler for the Main Injector will be discussed together with some simulations and test stand results.

Motivation & Objective

  • To enable non-invasive, high-precision transverse beam profile measurements for high-intensity proton beams (>2 MW) in Fermilab's Main Injector.
  • To address the limitations of traditional intrusive techniques (e.g., flying wires) at high intensities by implementing a non-destructive electron beam profiling method.
  • To ensure accurate beam profile reconstruction by mitigating external magnetic field interference through multi-layer mumetal shielding.
  • To validate the EBP's performance using simulations, test stand measurements, and calibration via optical transition radiation (OTR).
  • To complete the installation and integration of the EBP system, including HV transition boxes, for operational use in 2016.

Proposed method

  • The EBP uses a 60 keV, 6 mA thermionic electron gun with a LaB6 cathode, gated from 2 µs to DC at 1 kHz, to generate a focused electron beam.
  • Electrostatic deflection is achieved via a cylindrical, parallel-plate deflector with 15 cm long plates separated by ~2.5 cm, enabling precise beam steering.
  • The electron beam is deflected by the space charge of the proton beam (53 MHz, 1–2 ns bunch length), with deflection angle proportional to the beam's charge density.
  • Deflection data is recorded via a phosphor screen (P47, 400 nm emission, 60 ns decay) and imaged by an intensified CID camera system.
  • Calibration is performed using optical transition radiation (OTR) generated from a stainless steel mirror at the beam intersection point.
  • External magnetic fields are minimized using three-layer mumetal shielding around the beamline, with CST simulations confirming >95% field reduction.

Experimental results

Research questions

  • RQ1Can an electron beam profiler achieve sub-2% accuracy in reconstructing the transverse profile of a high-intensity proton beam in the Main Injector?
  • RQ2How effective is three-layer mumetal shielding in mitigating external magnetic fields (e.g., 2 G) that would otherwise deflect the low-energy electron beam by 100 mm?
  • RQ3To what extent does the slow-scan method with electron beam stepping along the transverse direction enable accurate beam profile reconstruction compared to simulations?
  • RQ4Can the longitudinal deflection profile, obtained via fast-scan along the proton bunch, be used to infer slice-by-slice beam structure and validate the measurement technique?
  • RQ5What are the key beam parameters (emittance, spot size, divergence) of the electron gun, and how do they affect profile reconstruction accuracy?

Key findings

  • The EBP was successfully installed in the Main Injector tunnel during the 2014 shutdown, with the electron beamline shielded by three layers of mumetal to reduce external magnetic fields.
  • Test stand measurements at ~50 keV and 1 mA beam current confirmed a beam emittance consistent with manufacturer specifications, with rms beam sizes of ~100 µm.
  • Simulations using MATLAB showed that the reconstructed transverse beam size (3.35 mm) matched the simulated value (3 mm) within 12%, and the longitudinal size (2.3 ns) matched the simulated 2 ns within 15%.
  • The SNS-based simulation demonstrated that the EBP technique can reconstruct beam profiles to within 2% of the actual profile using the slow-stepping method with a pencil beam.
  • The HV transition boxes were fabricated with safety features including relays, inductors, and resistors to manage stored energy in ~80 m RG 220 cables.
  • Initial system turn-on is scheduled for early 2016, following completion of all tunnel work and transition box integration.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.