TL;DR

This paper evaluates the feasibility of future particle collider projects—ranging from Higgs factories to multi-TeV lepton and hadron colliders—using standardized metrics for performance, technology readiness (TRL), cost, schedule, power use, and environmental impact. It presents a comprehensive assessment of 20+ collider proposals, concluding that while advanced technologies like plasma wakefield acceleration show promise, significant R&D and infrastructure investment are required for realization beyond the 2030s.

ABSTRACT

Colliders are essential research tools for particlephysics. Numerous future collider proposal were discussed in thecourse of the US high energy physics community strategic planningexercise Snowmass'21. The Implementation Task Force (ITF) hasbeen established to evaluate the proposed future acceleratorprojects for performance, technology readiness, schedule, cost, andenvironmental impact. Corresponding metrics has been developed foruniform comparison of the proposals ranging from Higgs/EW factoriesto multi-TeV lepton, hadron and ep collider facilities, based ontraditional and advanced acceleration technologies. This articledescribes the metrics and approaches, and presents evaluations offuture colliders performed by the ITF.

Motivation & Objective

  • To develop standardized metrics for comparing future collider projects across cost, schedule, technical readiness, and environmental impact.
  • To evaluate the performance, technology readiness, and R&D status of 20+ proposed collider facilities.
  • To assess the technical and financial feasibility of next-generation colliders, including Higgs factories, lepton colliders, and advanced wakefield accelerators.
  • To inform U.S. high energy physics strategic planning by providing a unified evaluation framework for accelerator projects.
  • To identify critical technology gaps and R&D needs for achieving future collider goals.

Proposed method

  • Developed a '30-Parameter Cost Model' to standardize cost estimation across diverse collider designs.
  • Applied Technical Readiness Level (TRL) framework (1–9) to assess technology maturity and risk.
  • Used GUINEA-PIG simulation tool to estimate luminosity, beamstrahlung, and power efficiency for various collider configurations.
  • Evaluated energy efficiency via wall plug to main beam power conversion, including laser/beam drive efficiency.
  • Analyzed facility size, power consumption, and environmental impact across circular, linear, and advanced accelerator designs.
  • Conducted timeline analysis based on R&D, test facility construction, and full-scale facility deployment schedules.

Experimental results

Research questions

  • RQ1What are the relative cost, schedule, and technical readiness levels of proposed future colliders?
  • RQ2How do different accelerator technologies (e.g., superconducting RF, plasma wakefield, energy recovery) compare in terms of performance and feasibility?
  • RQ3What are the environmental and power consumption impacts of next-generation collider facilities?
  • RQ4What R&D milestones and test facilities are required to advance the most promising collider concepts?
  • RQ5What are the projected timelines and cost scales for building and commissioning major future collider projects?

Key findings

  • The FCC-ee (Future Circular Collider e+e−) at CERN is projected to achieve 1.5×10^36 cm⁻²s⁻¹ luminosity with 14 km circumference and TRL 6–7, requiring ~10 years of R&D.
  • The C3 (Cold Copper Collider) linear e+e− design achieves 3 TeV center-of-mass energy with 14 km of linacs and 30% wall plug to main beam efficiency, but faces high cost and technical risk.
  • Plasma wakefield accelerators (e.g., 15 TeV WFA-based e+e− colliders) show high theoretical luminosity (up to 6×10^36 cm⁻²s⁻¹) but remain at TRL 3–4 with no prototype demonstration.
  • Energy recovery and ERL-based designs (e.g., ERLC, ReLiC) show promise for high efficiency (0.2–0.4 beam-to-luminosity efficiency) but require major R&D and are not yet at TRL 6.
  • The most advanced designs (e.g., ILC, CLIC, FCC-ee) are estimated to cost between $10B and $20B, with construction timelines extending to 2040–2050.
  • Site power demands range from 22 MW (FCC-ee) to over 1 GW (15 TeV WFA collider), with the latter requiring major advances in energy efficiency and infrastructure.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.