Skip to main content
QUICK REVIEW

[Paper Review] Optimal Operation of PV-Diesel MicroGrid with Multiple Diesel Generators under Grid Blackouts

Mansour Alramlawi, Ayeni Femi Timothy|arXiv (Cornell University)|Jun 26, 2018
Microgrid Control and OptimizationEngineering22 references3 citations
TL;DR

This paper proposes a mixed-integer nonlinear programming (MINLP) model for optimal operation of a battery-less PV-diesel microgrid with multiple diesel generators during grid blackouts, minimizing energy costs and PV curtailment. The strategy dynamically schedules multiple diesel generators of varying sizes to reduce fuel consumption and increase PV utilization, achieving a 43.97% cost reduction compared to a single-diesel system and a 29.64% reduction compared to a PV-plus-single-diesel setup.

ABSTRACT

This paper addresses the optimal operation problem of a PV-diesel microgrid considering grid blackouts, which is a usual case of discontinuous power supply in developing countries. The model of a grid-connected PV-diesel microgrid is enhanced, and new practical constraints are added. In addition, a new mixed-integer nonlinear programming (MINLP) problem is formulated to optimize the power flow in the microgrid for covering the load while minimizing the power consumption cost as well as maximizing the dispatched power from the PV-array. To demonstrate the applicability of the developed model and the optimal operation strategy, a comparison between different system configurations is made. The results show that the proposed microgrid can reduce the dispatched power cost while decreasing the power curtailment from the PV-array. Moreover, installing multiple diesel generators (DGs) can significantly reduce the fuel consumption by the

Motivation & Objective

  • To address the lack of optimization in multi-diesel-generator PV-diesel microgrids under grid blackouts.
  • To develop a cost-effective, battery-less microgrid solution for developing countries with unreliable grid supply.
  • To minimize total energy dispatch cost while maximizing PV power utilization and reducing diesel fuel consumption.
  • To incorporate practical constraints such as minimum diesel generator output and inverter grid-feeding limitations.

Proposed method

  • Formulated a mixed-integer nonlinear programming (MINLP) problem to optimize power flow in a grid-connected PV-diesel microgrid.
  • Integrated a three-component solar irradiance model (direct, diffuse, reflected) to accurately estimate PV output.
  • Used a single-diode PV cell model with temperature and irradiance dependence to compute real-time maximum power.
  • Incorporated technical constraints: minimum diesel generator output, inverter grid-feeding capability, and load power balance.
  • Implemented a dynamic dispatch strategy that selects the optimal subset of multiple diesel generators based on load and PV availability.
  • Ensured voltage and frequency stability by enforcing grid-feeding inverter constraints, avoiding islanding without a grid-forming source.

Experimental results

Research questions

  • RQ1How does the use of multiple diesel generators affect fuel consumption and energy cost in a PV-diesel microgrid during blackouts?
  • RQ2What is the impact of optimal dispatch on PV power utilization and curtailment reduction?
  • RQ3How does the proposed MINLP model improve cost efficiency compared to single-diesel or conventional systems?
  • RQ4To what extent can the microgrid maintain load supply while minimizing grid and diesel energy dispatch?
  • RQ5What role do technical constraints—especially inverter grid-feeding limitations—play in system operation?

Key findings

  • Case 3, with three diesel generators (200, 150, 150 kVA), reduced total annual energy cost by 43.97% compared to a single 500 kVA diesel generator (Case 1).
  • The total annual cost dropped from $862.25k in Case 1 to $483.08k in Case 3, a 43.97% reduction.
  • Annual diesel generator energy dispatch decreased from 1176.9 MWh (Case 1) to 770.59 MWh (Case 3), a 34.5% reduction.
  • The PV-diesel system with multiple generators increased dispatched PV power from 766.18 MWh (Case 2) to 915.60 MWh (Case 3), reducing curtailment.
  • The grid dispatch was reduced to 667.32 MWh in both Case 2 and Case 3, indicating that PV and diesel coordination effectively replaced grid reliance.
  • The optimal dispatch strategy enabled at least one diesel generator to remain online during blackouts, satisfying the minimum output constraint while minimizing fuel use.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.