[Paper Review] Optimizing Transmission Infrastructure Investments to Support Line De-energization for Mitigating Wildfire Ignition Risk
This paper proposes a mixed-integer linear programming (MILP) formulation that jointly optimizes transmission infrastructure investments—such as grid-scale batteries, solar PV, and line hardening—with line de-energization decisions during Public Safety Power Shutoff (PSPS) events to minimize both wildfire ignition risk and load shedding. The method enables tailored, budget-aware investment strategies that reduce system-wide risk and outage severity in wildfire-prone regions.
Wildfires pose a growing risk to public safety in regions like the western United States, and, historically, electric power systems have ignited some of the most destructive wildfires. To reduce wildfire ignition risks, power system operators preemptively de-energize high-risk power lines during extreme wildfire conditions as part of "Public Safety Power Shutoff" (PSPS) events. While capable of substantially reducing acute wildfire risks, PSPS events can also result in significant amounts of load shedding as the partially de-energized system may not be able to supply all customer demands. In this work, we investigate the extent to which infrastructure investments can support system operations during PSPS events by enabling reduced load shedding and wildfire ignition risk. We consider the installation of grid-scale batteries, solar PV, and line hardening or maintenance measures (e.g., undergrounding or increased vegetation management). Optimally selecting the locations, types, and sizes of these infrastructure investments requires considering the line de-energizations associated with PSPS events. Accordingly, this paper proposes a multi-period optimization formulation that locates and sizes infrastructure investments while simultaneously choosing line de-energizations to minimize wildfire ignition risk and load shedding. This formulation is evaluated using two geolocated test cases along with realistic infrastructure investment parameters and actual wildfire risk data from the US Geological Survey. We evaluate the performance of investment choices by simulating de-energization decisions for the entire 2021 wildfire season with optimized infrastructure placements. With investment decisions varying significantly for different test cases, budgets, and operator priorities, the numerical results demonstrate the proposed formulation's value in tailoring investment choices to different settings.
Motivation & Objective
- Address the growing threat of wildfire ignitions from electric power infrastructure, particularly in climate-affected regions like the western U.S.
- Reduce the adverse impacts of Public Safety Power Shutoff (PSPS) events, which cause significant load shedding despite reducing wildfire risk.
- Develop a systematic approach to select optimal locations, types, and sizes of infrastructure investments—batteries, solar PV, and line hardening—while simultaneously determining which lines to de-energize.
- Balance trade-offs between minimizing wildfire ignition risk and minimizing load shedding under budget and operational constraints.
- Provide a decision-support tool for utilities and planners to design resilient transmission systems that are both safer and more reliable during extreme wildfire conditions.
Proposed method
- Formulates a multi-period mixed-integer linear program (MILP) that models power system operations across multiple time periods during the 2021 wildfire season.
- Integrates line de-energization decisions as binary variables to represent PSPS actions, directly linking them to wildfire risk reduction.
- Incorporates infrastructure investment decisions for grid-scale batteries, solar photovoltaic (PV) systems, and line hardening (e.g., undergrounding, vegetation management) as continuous and binary variables.
- Uses actual wildfire risk data from the U.S. Geological Survey and geolocated test systems (e.g., 240-bus WECC case) to model spatial and temporal variations in risk and solar generation.
- Optimizes for two objectives: minimizing total wildfire ignition risk and minimizing total load shedding, with adjustable trade-offs via a weighted sum approach.
- Solves the MILP formulation using commercial solvers, with computational performance evaluated on real-world test cases under varying budgets and operator priorities.
Experimental results
Research questions
- RQ1How can infrastructure investments in batteries, solar PV, and line hardening be jointly optimized with line de-energization decisions to reduce wildfire ignition risk during PSPS events?
- RQ2What is the relative contribution of different infrastructure types (e.g., batteries vs. solar vs. line hardening) to reducing load shedding and wildfire risk under budget constraints?
- RQ3How do investment decisions vary across different geographic regions and wildfire risk profiles, and what factors drive these differences?
- RQ4To what extent does the joint consideration of de-energization and hardening improve system performance compared to optimizing them in isolation?
- RQ5How do varying budget levels and operator priorities (e.g., risk vs. load shedding minimization) affect the optimal investment and de-energization strategy?
Key findings
- The proposed MILP formulation successfully generates tailored investment and de-energization strategies that significantly reduce both wildfire ignition risk and load shedding across different test cases.
- Line hardening and maintenance measures—such as undergrounding and vegetation management—accounted for a substantial portion of the budget in optimal solutions, indicating high value in risk reduction without de-energization.
- The solver often de-energizes the highest-risk lines to fully eliminate their ignition potential while allocating remaining budget to harden moderate-risk lines, demonstrating strategic prioritization.
- Joint optimization of de-energization and hardening leads to better system performance than isolated optimization, as the interplay reduces overall risk and load shedding more effectively.
- Investment decisions vary significantly across test cases, budgets, and operator priorities, highlighting the need for context-specific planning tools.
- The computational framework is effective but challenging to scale, motivating future work on heuristics and decomposition techniques to improve tractability for large-scale systems.
Read this paper
Open the full text in the Nubint reader and ask about any passage as you read.
Read this paper on NubintThis review was generated by AI from the original paper. Please check the paper before citing it.