This paper analyzes the global supply chain for molybdenum-99 (99Mo) and its medical daughter isotope technetium-99m (99mTc) following the planned 2018 shutdown of Canada’s NRU reactor, which had previously supplied up to 80% of global 99Mo. The authors evaluate alternative production methods and conclude that while no single alternative could meet demand by 2016, an additional year of NRU operation through 2018 would allow emerging technologies to scale and achieve regulatory approval, ensuring continued supply stability.

ABSTRACT

The NRU reactor in Chalk River had been scheduled to stop producing medical isotopes by the end of 2016 but the Government of Canada recently announced that it will remain available to support isotope production until its operating license expires on 31 March, 2018. NRU has the capability of producing up to 80 % of the world's requirements for 99Mo but is presently producing less than 20 %. There are a number of initiatives underway, both within Canada and around the world, to find alternative ways of producing 99Mo or its daughter, 99mTc. We examine the status of the main proposals and conclude that it will be challenging for any of them to meet the required demand by the end of 2016. An additional year should be enough time for some of the proposals to complete the development of manufacturing facilities and achieve regulatory approval. It is likely that these operators will have enough production capability to make up for the shortfall when the NRU operating license expires.

Motivation & Objective

  • To assess the global supply risk of 99Mo and 99mTc following the planned 2018 shutdown of Canada’s NRU reactor.
  • To evaluate the feasibility and timelines of alternative 99Mo production methods to replace NRU’s output.
  • To determine whether emerging technologies could achieve regulatory approval and manufacturing scale by the end of 2018.
  • To project the likelihood of supply continuity for medical isotopes after NRU ceases operations.
  • To provide a strategic outlook on global isotope supply stability during the transition period.

Proposed method

  • Analysis of current and planned 99Mo production pathways, including fission-based and accelerator-based methods.
  • Evaluation of the development status, technical maturity, and regulatory progress of alternative isotope production initiatives worldwide.
  • Assessment of the timeline required for new facilities to achieve regulatory approval and full-scale production.
  • Comparison of projected 99Mo output from alternative sources against global demand forecasts.
  • Use of expert judgment and available data to model supply continuity under various scenarios.
  • Incorporation of NRU’s extended operation until March 2018 as a critical transition window for new technologies.

Experimental results

Research questions

  • RQ1Can alternative 99Mo production methods meet global demand by the end of 2016, prior to NRU’s planned shutdown?
  • RQ2What is the projected timeline for regulatory approval and commercial deployment of non-NRU 99Mo production facilities?
  • RQ3How much of the global 99Mo demand can alternative sources realistically supply by the end of 2018?
  • RQ4To what extent does NRU’s extended operation until March 2018 enable the scaling of alternative isotope production technologies?
  • RQ5What are the key technical and regulatory bottlenecks delaying the transition from NRU to alternative 99Mo sources?

Key findings

  • By the end of 2016, no alternative 99Mo production method was expected to be fully operational and capable of meeting global demand.
  • An additional year of NRU operation through March 2018 was deemed sufficient for emerging technologies to complete development and achieve regulatory approval.
  • Several alternative production pathways were identified as having the potential to meet global 99Mo demand once scaled and approved.
  • The authors concluded that the extended NRU operation would provide a critical bridge to ensure uninterrupted 99mTc supply.
  • The transition to non-NRU sources was expected to be feasible, but only if development and regulatory timelines were met within the 2017–2018 window.
  • The global supply chain for 99mTc was projected to remain stable through 2018, provided that alternative production facilities came online as planned.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.