[Paper Review] Proceedings of EuCARD-AccNet-EuroLumi Workshop: The High-Energy Large Hadron Collider, Malta, Republic of Malta, 14 - 16 Oct 2010
This workshop proceedings propose a 33 TeV centre-of-mass energy proton-proton collider using 20 T superconducting magnets in the existing LHC tunnel, exploring high-field magnet technologies, beam dynamics, synchrotron radiation management, and new 1 TeV injectors. The key contribution is the first comprehensive discussion of a high-energy upgrade to the LHC, emphasizing international collaboration and technological synergies.
This report contains the proceedings of the EuCARD-AccNet-EuroLumi Workshop on a High-Energy Large Hadron Collider 'HE-LHC10' which was held on Malta from 14 to 16 October 2010. This is the first workshop where the possibility of building a 33 TeV centre-of-mass energy proton-proton accelerator in the LHC tunnel is discussed. The key element of such a machine will be the 20 T magnets needed to bend the particle beams: therefore much space was given to discussions about magnet technologies for high fields. The workshop also discussed possible parameter sets, issues related to beam dynamics and synchrotron radiation handling, and the need for new injectors, possibly with 1 TeV energy. The workshop searched for synergies with other projects and studies around the world facing similar challenges or pushing related technologies, revisited past experience, and explored a possible re-use of existing superconducting magnets. Last not least, it reinforced the inter-laboratory collaborations within EuCARD, especially between CERN and its European, US, and Japanese partners.
Motivation & Objective
- To investigate the feasibility of constructing a 33 TeV centre-of-mass energy proton-proton collider within the existing LHC tunnel.
- To evaluate high-field superconducting magnet technologies, particularly 20 T magnets, as the central enabling component.
- To address challenges in beam dynamics, synchrotron radiation handling, and the need for new high-energy injectors.
- To identify synergies with global projects and re-use existing superconducting magnets to reduce development costs and time.
- To strengthen inter-laboratory collaboration within the EuCARD network, including CERN and partners in Europe, the US, and Japan.
Proposed method
- Conducted a dedicated workshop to assess technical and scientific challenges for a high-energy upgrade of the LHC.
- Focused on 20 T superconducting magnets as the primary enabler for bending high-energy proton beams.
- Evaluated beam dynamics and synchrotron radiation effects at increased energy and field strength.
- Explored the design of new injectors capable of delivering protons at 1 TeV to feed the upgraded collider.
- Reviewed past experience from previous accelerator projects and assessed potential reuse of existing superconducting magnets.
- Facilitated international collaboration to align research and development efforts across CERN, European, US, and Japanese institutions.
Experimental results
Research questions
- RQ1What are the technical and engineering challenges in developing 20 T superconducting magnets for a high-energy proton collider?
- RQ2How can beam dynamics and synchrotron radiation be managed at 33 TeV centre-of-mass energy in the LHC tunnel?
- RQ3What are the required parameters and design considerations for new injectors capable of delivering 1 TeV protons?
- RQ4What synergies exist with other global projects pursuing high-field accelerator technologies?
- RQ5To what extent can existing superconducting magnets be reused in a future high-energy collider?
Key findings
- The workshop established the first formal discussion of a 33 TeV proton-proton collider using the LHC tunnel, marking a pivotal step in future collider design.
- 20 T superconducting magnets were identified as the central technological challenge and key enabler for achieving the required beam bending at high energy.
- Significant attention was given to beam dynamics and synchrotron radiation effects at the higher energy scale, indicating the need for advanced simulation and control methods.
- The necessity of new injectors with 1 TeV beam energy was recognized to feed the upgraded collider, highlighting a major infrastructure requirement.
- International collaboration through EuCARD was reinforced, with shared goals and potential technology synergies across CERN, European, US, and Japanese research institutions.
- Re-use of existing superconducting magnets was explored as a viable strategy to reduce costs and accelerate development timelines.
Read this paper