[Paper Review] Project Icarus: Preliminary Thoughts on the Selection of Probes and Instruments for an Icarus-style Interstellar Mission
This paper outlines the scientific payload requirements for an Icarus-style interstellar mission, proposing a minimum of 100 tonnes for decelerated science instruments and probes, with an estimated total science-related payload mass of ~200 tonnes when accounting for structural and deployment systems. Based on the Daedalus study, it emphasizes that propulsion and infrastructure add a factor of two to the dry mass of the science probes.
In this paper we outline the range of probes and scientific instruments that will be required in order for Icarus to fulfill its scientific mission of exploring a nearby star, its attendant planetary system, and the intervening interstellar medium. Based on this preliminary analysis, we estimate that the minimum total Icarus scientific payload mass (i.e. the mass of probes and instruments which must be decelerated to rest in the target system to enable a meaningful programme of scientific investigation) will be in the region of 100 tonnes. Of this, approximately 10 tonnes would be allocated for cruise-phase science instruments, and about 35 tonnes (i.e. the average of estimated lower and upper limits of 28 and 41 tonnes) would be contributed by the intra-system science payload itself (i.e. the dry mass of the stellar and planetary probes and their instruments). The remaining ~55 tonnes is allocated for the sub-probe intra-system propulsion requirements (crudely estimated from current Solar System missions; detailed modelling of sub-probe propulsion systems will be needed to refine this figure). The overall mass contributed by the science payload to the total that must be decelerated from the interstellar cruise velocity will be considerably more than 100 tonnes, however, as allowance must be made for the payload structural and infrastructural elements required to support, deploy, and communicate with the science probes and instruments. Based on the earlier Daedalus study, we estimate another factor of two to allow for these components. Pending the outcome of more detailed studies, it therefore appears that an overall science-related payload mass of ~200 tonnes will be required. This paper is a submission of the Project Icarus Study Group.
Motivation & Objective
- To determine the minimum mass requirements for scientific probes and instruments in an Icarus-style interstellar mission.
- To assess the total payload mass that must be decelerated to conduct meaningful scientific investigations at a target star system.
- To estimate the contribution of propulsion, structural, and communication systems to the overall science payload mass.
- To refine the mass allocation for cruise-phase and intra-system science instruments based on prior studies like Daedalus.
- To provide a foundation for future detailed modeling of sub-probe propulsion and payload deployment systems.
Proposed method
- Conduct a preliminary analysis of scientific instruments and probes required for interstellar exploration of a nearby star system and the interstellar medium.
- Estimate the dry mass of stellar and planetary probes and their instruments at 35 tonnes, based on the average of 28 and 41 tonnes as lower and upper bounds.
- Allocate 10 tonnes for cruise-phase science instruments based on current Solar System mission data.
- Estimate 55 tonnes for sub-probe intra-system propulsion, derived from analogous mission data.
- Apply a factor of two multiplier to the total science payload mass to account for structural, deployment, and communication infrastructure, based on the Daedalus study.
- Synthesize all components to project a total science-related payload mass of approximately 200 tonnes.
Experimental results
Research questions
- RQ1What is the minimum total mass of probes and instruments that must be decelerated to enable scientific investigation at a target star system in an Icarus-style mission?
- RQ2How much of the total payload mass is attributable to the intra-system science probes and their instruments, excluding propulsion and infrastructure?
- RQ3What is the estimated mass contribution of sub-probe propulsion systems to the total decelerated payload mass?
- RQ4How do structural and infrastructural elements (e.g., deployment mechanisms, communication systems) affect the total science payload mass?
- RQ5To what extent do findings from the Daedalus study inform the mass scaling for Icarus mission architecture?
Key findings
- The minimum total mass of probes and instruments that must be decelerated to conduct a meaningful scientific investigation is estimated at 100 tonnes.
- The intra-system science payload, including probes and their instruments, accounts for approximately 35 tonnes, based on the average of 28 and 41 tonnes as estimated limits.
- Cruise-phase science instruments are projected to require 10 tonnes of mass.
- Sub-probe intra-system propulsion is estimated at 55 tonnes, based on analogies with current inner-planet Solar System missions.
- When accounting for structural and infrastructural components such as deployment and communication systems, a factor of two multiplier is applied, leading to a total estimated science-related payload mass of ~200 tonnes.
- The study concludes that detailed modeling of propulsion systems is required to refine the 55-tonne propulsion mass estimate.
Read this paper
Open the full text in the Nubint reader and ask about any passage as you read.
Read this paper on NubintThis review was generated by AI from the original paper. Please check the paper before citing it.