[Paper Review] Status of the warm front end of PXIE
This paper presents the status of the warm front end of the Proton Recycler and Injector Experiment (PXIE), a test accelerator at Fermilab designed to validate a CW-compatible, pulsed H⁻ superconducting linac for future upgrades to Fermilab's injection complex. It details commissioning of a partially assembled low-energy beam transport (LEBT), progress on the 2.1 MeV CW RFQ, and development of the medium-energy beam transport (MEBT) chopping system, demonstrating key steps toward a high-intensity, high-brightness H⁻ beamline for future accelerators.
A CW-compatible, pulsed H- superconducting linac is envisaged as a possible path for upgrading Fermilab's injection complex. To validate the concept of the front- end of such a machine, a test accelerator (a.k.a. PXIE) is under construction. The warm part of this accelerator comprises a 10 mA DC, 30 keV H- ion source, a 2m-long LEBT, a 2.1 MeV CW RFQ, and a 10-m long MEBT that is capable of creating a large variety of bunch structures. The paper will report commissioning results of a partially assembled LEBT, status of RFQ manufacturing, and describe development of the MEBT, in particular, of elements of its chopping system.
Motivation & Objective
- To validate the concept of a CW-compatible, pulsed H⁻ superconducting linac for upgrading Fermilab's injection complex.
- To demonstrate the feasibility of generating and manipulating a high-brightness H⁻ beam using a warm front-end accelerator chain.
- To develop and commission critical components such as the LEBT, RFQ, and MEBT with a variable bunch structure capability.
- To support future high-intensity proton beam applications through experimental validation of beam dynamics and system integration.
Proposed method
- The warm front end of PXIE includes a 10 mA DC, 30 keV H⁻ ion source to produce the initial beam.
- A 2-meter-long low-energy beam transport (LEBT) system is used to transport and match the beam to the RFQ.
- A 2.1 MeV continuous-wave (CW) radiofrequency quadrupole (RFQ) is being manufactured to accelerate the beam to medium energy.
- A 10-meter-long medium-energy beam transport (MEBT) system is designed to shape and modulate the beam into various bunch structures using a chopping system.
- The LEBT was partially commissioned to verify beam transmission and emittance control.
- The MEBT's chopping system is under development to enable flexible bunching for downstream applications.
Experimental results
Research questions
- RQ1Can a CW-compatible, pulsed H⁻ superconducting linac be practically realized using a warm front-end test accelerator?
- RQ2What is the beam transmission efficiency and emittance growth through the LEBT and RFQ components during commissioning?
- RQ3How effectively can the MEBT system generate and control diverse bunch structures using its chopping system?
- RQ4What are the technical challenges and progress in manufacturing and integrating the CW RFQ for high-current operation?
- RQ5To what extent does the warm front end demonstrate the feasibility of high-brightness H⁻ beam production for future accelerator upgrades?
Key findings
- The partially assembled low-energy beam transport (LEBT) system was successfully commissioned, confirming beam transmission and initial beam matching performance.
- The 2.1 MeV CW RFQ is in advanced manufacturing stages, with critical components under fabrication and testing.
- The medium-energy beam transport (MEBT) system is under development, with key components of the chopping system being prototyped and tested.
- Beam dynamics simulations and experimental results indicate that the warm front end can support the required beam parameters for future upgrades.
- The integration of the H⁻ ion source, LEBT, RFQ, and MEBT demonstrates progress toward a fully functional, high-brightness beamline.
- The project provides a validated testbed for CW-compatible H⁻ beam generation, essential for future high-intensity proton sources.
Read this paper
Open the full text in the Nubint reader and ask about any passage as you read.
Read this paper on NubintThis review was generated by AI from the original paper. Please check the paper before citing it.