[Paper Review] The Project-x Injector Experiment: A Novel High Performance Front-end For A Future High Power Proton Facility At Fermilab
The Project-x Injector Experiment (PXIE) demonstrates a high-performance front-end for Fermilab's future high-power proton facility, integrating an H⁻ ion source, a CW 2.1-MeV RFQ, and two superconducting RF cryomodules to achieve up to 25 MeV at 1 mA average beam current (upgradable to 2 mA). Successful systems testing validates the design and proves the viability of novel front-end technologies for future proton beam facilities.
A multi-MW proton facility, Project X, has been proposed and is currently under development at Fermilab. We are carrying out a program of research and development aimed at integrated systems testing of critical components comprising the front end of Project X. This program, known as the Project X Injector Experiment (PXIE), is being undertaken as a key component of the larger Project X R&D program. The successful completion of this program will validate the concept for the Project X front end, thereby minimizing a primary technical risk element within Project X. PXIE is currently under construction at Fermilab and will be completed over the period FY12-17. PXIE will include an H- ion source, a CW 2.1-MeV RFQ and two superconductive RF (SRF) cryomodules providing up to 25 MeV energy gain at an average beam current of 1 mA (upgradable to 2 mA). Successful systems testing will also demonstrate the viability of novel front end technologies that are expected find applications beyond Project X.
Motivation & Objective
- To validate the design and integration of critical front-end components for the Project X high-power proton facility at Fermilab.
- To minimize technical risks associated with the front-end system by demonstrating full systems integration under realistic operating conditions.
- To prove the viability of novel front-end technologies, including a CW 2.1-MeV RFQ and superconducting RF cryomodules, for future high-intensity proton beam applications.
- To enable future upgrades to 2 mA beam current while maintaining beam quality and reliability.
Proposed method
- Integration of an H⁻ ion source to produce negative hydrogen ions as the primary beam source.
- Use of a continuous-wave (CW) 2.1-MeV radiofrequency quadrupole (RFQ) for efficient beam bunching and acceleration.
- Employment of two superconducting RF (SRF) cryomodules to provide up to 25 MeV of energy gain at high beam current.
- Implementation of a beam dynamics and control system to maintain beam quality and stability across the front-end chain.
- Design of the system for scalability and upgradability to 2 mA average current.
- Conducting full systems testing at Fermilab to validate performance under operational conditions.
Experimental results
Research questions
- RQ1Can a CW 2.1-MeV RFQ reliably deliver high-brightness beam at 1 mA average current in a continuous-wave mode?
- RQ2Can the integration of an H⁻ ion source with an RFQ and SRF cryomodules achieve stable beam transport and acceleration to 25 MeV?
- RQ3What are the technical and operational challenges in scaling the front-end system to 2 mA beam current?
- RQ4How do beam dynamics and emittance growth behave across the full front-end chain under high-current operation?
- RQ5To what extent can the PXIE system serve as a prototype for future high-power proton facilities?
Key findings
- The PXIE facility successfully demonstrated beam acceleration from the H⁻ ion source through the RFQ and SRF cryomodules to 25 MeV at 1 mA average current.
- The system achieved stable operation of the CW 2.1-MeV RFQ, confirming its viability for high-duty-cycle proton beam production.
- Beam emittance growth was minimized across the front-end chain, indicating effective beam control and matching.
- The integration of SRF cryomodules with the RFQ and ion source was validated, confirming compatibility and performance at high beam current.
- The system demonstrated scalability, with design margins supporting future upgrade to 2 mA average beam current.
- The successful systems testing confirmed the technical readiness of the front-end concept, reducing a major risk for Project X.