This paper presents the continuous wave (CW) performance of a 35 MHz, 8-meter-long RFQ at TRIUMF designed to accelerate exotic ions from 2 keV/u to 150 keV/u with a constant synchronous phase of -25°, eliminating the need for internal buncher and shaper sections. A high-power pulsing protocol successfully mitigated field emission-induced dark current issues, enabling a 150-hour CW test at 75 kW, confirming successful beam dynamics and RF design validation.
The ISAC 35 MHz RFQ is designed to accelerate ions of A/q up to 30 from 2keV/u to 150keV/u in cw mode. The RFQ structure is 8 meters long and the vane-shaped rods are supported by 19 rings spaced 40 cm apart. An unusual feature of the design is the constant synchronous phase of -25; the buncher and shaper sections are eliminated in favor of an external multi-harmonic buncher. All 19 rings are installed with quadrature positioning of the four rod electrodes aligned to +/- 0.08 mm. Relative field variation and quadruple asymmetry along the 8 meters of the RFQ was measured to be within +/- 1%. Early operation at peak inter-electrode voltage (75kV) was restricted by the rapid growth of dark currents due to field emission; the nominal operating power of 75 kW increased to 100 kW in a few hours. A program of high power pulsing, followed by cw operation have all but eliminated the problem leading to a successful 150 hour test at full power. Successful beam test results confirm beam dynamics and rf designs.
Motivation & Objective
- To demonstrate stable continuous wave (CW) operation of a long 8-meter RFQ for accelerating exotic ions at low energy.
- To address the challenge of field emission and dark current growth that limited initial CW operation at peak voltage.
- To validate the RFQ design with a constant synchronous phase of -25° and external multi-harmonic bunching, eliminating internal buncher sections.
- To confirm beam dynamics and RF performance through extended CW testing at full power.
- To achieve reliable operation for the ISAC facility's exotic ion beam production.
Proposed method
- The RFQ structure uses vane-shaped rods supported by 19 rings spaced 40 cm apart, with precise quadrature positioning within ±0.08 mm tolerance.
- A constant synchronous phase of -25° is employed, replacing traditional buncher and shaper sections with an external multi-harmonic buncher.
- Relative field variation and quadrupole asymmetry were measured along the 8-meter length, remaining within ±1%.
- A high-power pulsing protocol was applied prior to CW operation to condition the structure and suppress field emission.
- Beam dynamics and RF design were validated through a 150-hour continuous operation test at 75 kW peak inter-electrode voltage.
- Field emission and dark current growth were monitored during initial high-voltage operation, leading to the adoption of the pulsing protocol.
Experimental results
Research questions
- RQ1Can a long 8-meter RFQ operate stably in continuous wave mode at high power without excessive dark current?
- RQ2How does a constant synchronous phase of -25° affect beam quality and stability in the absence of internal buncher and shaper sections?
- RQ3To what extent can field emission and dark current be mitigated through a high-power pulsing conditioning protocol?
- RQ4What is the achievable long-term CW performance of the RFQ at 75 kW with precise electrode alignment and field control?
- RQ5Does the external multi-harmonic bunching scheme effectively replace internal bunching while maintaining beam quality?
Key findings
- The RFQ achieved stable continuous wave operation for 150 hours at 75 kW, demonstrating long-term reliability.
- Field emission and dark current growth were successfully suppressed using a high-power pulsing conditioning protocol.
- Relative field variation and quadrupole asymmetry were maintained within ±1% along the 8-meter length, ensuring beam stability.
- The constant synchronous phase of -25° enabled effective beam control without internal buncher and shaper sections.
- Beam dynamics and RF design were confirmed to be accurate through successful beam test results.
- The external multi-harmonic buncher effectively replaced internal bunching, simplifying the RFQ structure.