TL;DR

This paper presents the successful high-power continuous wave (CW) operation of the LEDA RFQ accelerator, which achieved 100 mA of proton beam current at 6.7 MeV using a 350-MHz radio-frequency quadrupole. Despite exceeding its design field levels by 10%, the RFQ maintained 94% transmission and dissipated 1.5 MW of RF power, demonstrating stable CW operation at 670 kW beam power with 111 hours of cumulative beam time.

ABSTRACT

The LEDA RFQ, a 350-MHz continuous wave (CW) radio-frequency quadrupole (RFQ), successfully accelerated a 100-mA CW proton beam from 75 keV to 6.7 MeV. We have accumulated 111 hr of beam on time with at least 90 mA of CW output beam current. The 8-m-long RFQ accelerates a dc, 75-keV, ~106-mA H+ beam from the LEDA injector with ~94% transmission. When operating the RFQ at the RF power level for which it was designed, the peak electrical field on the vane tips is 33 MV/m. However, to maintain the high transmission quoted above with the CW beam, it was necessary to operate the RFQ with field levels ~10% higher than design. The RFQ dissipates 1.5 MW of RF power when operating with this field. Three klystrons provide the 2.2 MW of RF power required by the RFQ to accelerate the 100-mA beam. The beam power is 670 kW. Some of the challenges that were met in accelerating a 100-mA CW proton beam to 6.7 MeV, will be discussed.

Motivation & Objective

  • To demonstrate stable, high-current continuous wave (CW) operation of the LEDA RFQ accelerator at 100 mA beam current.
  • To investigate the challenges of operating an RFQ at power levels exceeding its original design specifications.
  • To achieve and maintain high transmission efficiency (≥90%) with a 100-mA CW proton beam over extended operational periods.
  • To validate the performance of the RFQ under high-power conditions, including thermal and RF stability.
  • To assess the feasibility of using klystrons to deliver 2.2 MW of RF power for sustained high-current beam acceleration.

Proposed method

  • The LEDA RFQ, a 350-MHz continuous wave radio-frequency quadrupole, was operated with a 75-keV, ~106-mA H+ beam from the injector.
  • RF power was supplied by three klystrons, delivering 2.2 MW to the RFQ to sustain 100-mA beam current.
  • The RFQ was operated at a peak electrical field of 33 MV/m on the vane tips, exceeding the design level by 10% to maintain high transmission.
  • Beam transmission was measured at 94% over the 8-meter length of the RFQ during high-power operation.
  • RF power dissipation reached 1.5 MW under full beam loading, indicating significant thermal and RF loading challenges.
  • Operational stability was maintained over 111 hours of cumulative beam-on time at 90 mA or higher current.

Experimental results

Research questions

  • RQ1What is the maximum stable beam current achievable in a CW RFQ accelerator under high RF power loading?
  • RQ2How does operation above the design field level affect beam transmission and RFQ stability in a CW proton accelerator?
  • RQ3What are the thermal and RF loading challenges when operating an RFQ at 1.5 MW of dissipated RF power with a 100-mA beam?
  • RQ4Can high transmission (≥94%) be maintained in a CW RFQ when operating above its nominal field design?
  • RQ5What power levels and klystron configurations are required to sustain 100-mA CW proton beam acceleration to 6.7 MeV?

Key findings

  • The LEDA RFQ successfully accelerated a 100-mA CW proton beam from 75 keV to 6.7 MeV, achieving a beam power of 670 kW.
  • The RFQ maintained 94% transmission efficiency over its 8-meter length when operating with a 100-mA beam current.
  • The peak electrical field on the vane tips reached 33 MV/m, which was 10% higher than the design value to ensure high transmission.
  • The RFQ dissipated 1.5 MW of RF power during operation, requiring 2.2 MW of input RF power from three klystrons.
  • The system operated continuously for 111 hours with at least 90 mA of beam current, demonstrating long-term stability.
  • The results confirm the feasibility of high-power, high-current CW operation in RFQ accelerators beyond initial design parameters.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.