[Paper Review] Minimizing Completion Times of Stochastic Jobs on Parallel Machines is Hard

Benjamin Moseley, Kirk Pruhs|University of Twente Research Information|Jan 24, 2026
Scheduling and Optimization AlgorithmsEngineering0 citations
TL;DR

The paper proves #P-hard hardness for minimizing expected total weighted completion time of stochastic jobs on parallel identical machines, even with two-point distributions and unit weights, and shows evaluating WSEPT/SEPT is #P-hard.

ABSTRACT

This paper considers the scheduling of stochastic jobs on parallel identical machines to minimize the expected total weighted completion time. While this is a classical problem with a significant body of research on approximation algorithms over the past two decades, constant-factor performance guarantees are currently known only under very restrictive assumptions on the input distributions, even when all job weights are identical. This algorithmic difficulty is striking given the lack of corresponding complexity results: to date, it is conceivable that the problem could be solved optimally in polynomial time. We address this gap with hardness results that demonstrate the problem's inherent intractability. For the special case of discrete two-point processing time distributions and unit weights, we prove that deciding whether there exists a scheduling policy with expected cost at most a given threshold is #P-hard. Furthermore, we show that evaluating the expected objective value of the standard (W)SEPT greedy policy is itself #P-hard. These represent the first hardness results for scheduling independent stochastic jobs and min-sum objective that do not merely rely on the intractability of the underlying deterministic counterparts.

Motivation & Objective

  • Motivate whether stochastic parallel-machine scheduling is computationally harder than deterministic scheduling.
  • Show that deciding if a policy achieves a threshold expected cost is #P-hard under restricted two-point distributions.
  • Establish hardness of evaluating the expected objective for common policies like WSEPT/SEPT.
  • Extend hardness to the min-sum objective without relying on deterministic reductions.

Proposed method

  • Construct knapsack-based reductions to encode counting feasible solutions as differences in expected start times under WSEPT/SEPT.
  • Define knapsack-type stochastic jobs with processing times 1/n or s_j, each with probability 1/2, independently.
  • Create two instances with blocker and dummy jobs to force identical vs. differing schedules under WSEPT/SEPT.
  • Use #P-hardness of counting knapsack feasible subsets to deduce #P-hardness of computing E[sum w_j C_j] or E[sum C_j].
  • Prove that computing exact expected costs for WSEPT/SEPT is #P-hard via conditioning on blocker-job realizations and analyzing cost differences.
Figure 1: Illustration for an instance with $n=m=9$ : Schedules for the two scheduling instances with blocker jobs (blue), knapsack jobs (striped), and dummy job (tiled) for some NO realization of the processing times. Note that except for the knapsack job on machine no. 2, all start times are ident
Figure 1: Illustration for an instance with $n=m=9$ : Schedules for the two scheduling instances with blocker jobs (blue), knapsack jobs (striped), and dummy job (tiled) for some NO realization of the processing times. Note that except for the knapsack job on machine no. 2, all start times are ident

Experimental results

Research questions

  • RQ1Is the problem of computing an optimal scheduling policy for minimizing E[sum_j w_j C_j] on parallel identical machines #P-hard?
  • RQ2Can evaluating the exact expected cost of fixed policies (like WSEPT or SEPT) be #P-hard, even with restricted distributions?
  • RQ3Does hardness persist for the unweighted case or when distributions have only two points?
  • RQ4How does the stochastic problem relate in hardness to the deterministic SPT benchmark?
  • RQ5Can hardness results be extended from policy evaluation to decision problems about threshold costs?

Key findings

  • Deciding whether a policy achieves a given threshold cost is #P-hard for the stochastic parallel-machine scheduling problem with two-point processing times and unit weights.
  • Computing the exact expected objective value of WSEPT or SEPT is #P-hard. 0
  • The results provide the first hardness evidence for stochastic scheduling with min-sum objective without relying on deterministic counterparts.
  • Hardness holds even under restricted stochasticity and identical machines, separating the stochastic problem from its deterministic analogue.
  • The minimum-cost scheduling problem for stochastic jobs is #P-hard to compute, implying intractability of both optimal policy computation and exact evaluation of common policies.

Read this paper