Skip to main content
QUICK REVIEW

[Paper Review] On the largest component in the subcritical regime of the Bohman-Frieze process

Sanchayan Sen|arXiv (Cornell University)|Jul 8, 2013
Stochastic processes and statistical mechanicsMathematics13 references4 citations
TL;DR

This paper resolves a conjecture by Kang, Perkins, and Spencer (2013) on the Bohman-Frieze random graph process by proving that, in the subcritical regime, the size of the largest component is tightly bounded by $ O(\log n / (t_c - t)^2) $ with high probability for $ t \leq t_c - \lambda n^{-1/3} $, improving upon prior $ O((\log n)^4 / (t_c - t)^2) $ bounds. The result is established via a refined analysis of the process's connection to inhomogeneous random graphs and branching process approximations.

ABSTRACT

Kang, Perkins and Spencer showed that the size of the largest component of the Bohman-Frieze process at a fixed time $t$ smaller than $t_c$, the critical time for the process is $L_1(t)=Ω(\log n/(t_c-t)^2)$ with high probability. They also conjectured that this is the correct order, that is $L_1(t)=O(\log n/(t_c-t)^2)$ with high probability for fixed $t$ smaller than $t_c$. Using a different approach, Bhamidi, Budhiraja and Wang showed that $L_1(t_n)=O((\log n)^4/(t_c-t_n)^2)$ with high probability for $t_n\leq t_c-n^{-γ}$ where $γ\in(0,1/4)$. In this paper, we improve their result by showing that for any fixed $λ>0$, $L_1(t_n)=O(\log n/(t_c-t_n)^2)$ with high probability for $t_n\leq t_c-λn^{-1/3}$. In particular, this settles the conjecture of Kang, Perkins and Spencer. We also prove some generalizations for general bounded size rules.

Motivation & Objective

  • To resolve a conjecture by Kang, Perkins, and Spencer (2013) on the order of the largest component in the subcritical Bohman-Frieze process.
  • To close the gap between the critical window and earlier bounds valid only for $ t \leq t_c - n^{-\gamma} $ with $ \gamma < 1/4 $.
  • To extend the analysis to general bounded size rules and determine conditions under which the same upper bound holds up to the critical window.
  • To improve upon the $ O((\log n)^4 / (t_c - t)^2) $ bound by Bhamidi, Budhiraja, and Wang (2013) using a more refined stochastic analysis.

Proposed method

  • Adapting the inhomogeneous random graph coupling method from Bhamidi, Budhiraja, and Wang (2013) with a more careful analysis of component size dynamics.
  • Using a branching process approximation to model component growth, particularly near the critical time $ t_c $.
  • Applying moment bounds and exponential tail estimates on component sizes via a coupling with a continuous-time branching process.
  • Introducing a measure-theoretic analysis involving the Radon-Nikodym derivative to control the decay of probabilities in the coupling.
  • Establishing a differential inequality framework to bound the growth of component sizes using the system of ODEs governing the bounded size rule process.
  • Using the parameter $ \zeta(F) $ to characterize the growth rate of component sizes and determine the validity window of the upper bound.

Experimental results

Research questions

  • RQ1Is the conjectured order $ O(\log n / (t_c - t)^2) $ for the largest component size in the subcritical Bohman-Frieze process correct?
  • RQ2Can the upper bound on the largest component size be extended from $ t \leq t_c - n^{-\gamma} $ with $ \gamma < 1/4 $ to $ t \leq t_c - \lambda n^{-1/3} $ for any fixed $ \lambda > 0 $?
  • RQ3Under what conditions on the bounded size rule $ F $ does the $ O(\log n / (t_c - t)^2) $ upper bound hold up to the critical window?
  • RQ4How does the growth rate of component sizes, governed by the system of ODEs, affect the tightness of the upper bound?

Key findings

  • The conjecture by Kang, Perkins, and Spencer (2013) is confirmed: $ L_1^{DBF}(t) = O(\log n / (t_c - t)^2) $ with high probability for any fixed $ t < t_c $.
  • The upper bound is extended to $ t_n \leq t_c - \lambda n^{-1/3} $ for any fixed $ \lambda > 0 $, closing the gap to the critical window.
  • For general bounded size rules, the upper bound holds up to the critical window if $ \zeta(F) \geq 1/3 $, which depends on the growth rates of component size functions near zero.
  • The bound fails to hold up to the critical window when $ K \geq 3 $, as $ \zeta(F) \leq 1/4 \cdot (1 + 1/4) < 1/3 $, indicating a regime-dependent limitation.
  • The analysis shows that the component size growth is governed by the initial behavior of the ODE system, particularly $ x_2'(0) = 1 $ and $ x_\omega'(u) \geq C u^3 $, leading to $ m_{c_j} \leq 5 $ and enabling the $ \delta^{2\beta} $ decay in the error term.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.