This paper details the upgrades required for CERN's Super Proton Synchrotron (SPS) to support the High Luminosity LHC (HL-LHC) era, focusing on beam performance enhancements through hardware upgrades, machine studies, and simulations. It outlines progress in addressing limitations identified during 2012 operations, estimates achievable performance, and identifies remaining decisions on upgrade paths to meet HL-LHC beam intensity and emittance demands.
The demanding beam performance requirements of the High Luminosity (HL-) LHC project translate into a set of requirements and upgrade paths for the LHC injector complex. In this paper the performance requirements for the SPS and the known limitations are reviewed in the light of the 2012 operational experience. The various SPS upgrades in progress and still under consideration are described, in addition to the machine studies and simulations performed in 2012. The expected machine performance reach is estimated on the basis of the present knowledge, and the remaining decisions that still need to be made concerning upgrade options are detailed.
Motivation & Objective
- Address the beam performance requirements of the HL-LHC project by upgrading the SPS injector complex.
- Identify and resolve known limitations in the SPS based on 2012 operational experience.
- Define upgrade paths for the SPS to support increased beam intensity and emittance control required by the HL-LHC.
- Evaluate the expected machine performance based on current upgrade strategies and simulations.
- Outline remaining technical and design decisions needed to finalize the SPS upgrade strategy.
Proposed method
- Conduct machine studies and simulations in 2012 to assess SPS performance under HL-LHC conditions.
- Analyze beam dynamics and impedance limitations affecting beam stability and emittance growth.
- Evaluate hardware upgrade options, including RF systems, chromaticity correction, and beam instrumentation.
- Model beam parameters such as intensity, emittance, and loss patterns under upgraded configurations.
- Use simulation results to estimate achievable performance and identify bottlenecks.
- Integrate findings from CERN and Fermilab teams to assess feasibility and technical risks of proposed upgrades.
Experimental results
Research questions
- RQ1What are the key beam performance limitations of the SPS that must be addressed for the HL-LHC?
- RQ2How do 2012 operational data inform the upgrade strategy for the SPS?
- RQ3What are the most viable upgrade options for the SPS to meet HL-LHC beam requirements?
- RQ4What performance improvements can be expected from the proposed SPS upgrades based on simulations?
- RQ5Which technical decisions remain unresolved in the SPS upgrade path?
Key findings
- The SPS upgrade is essential to meet the HL-LHC's requirement for increased beam intensity and reduced emittance.
- Machine studies from 2012 revealed critical limitations in beam stability and impedance that must be mitigated.
- Several upgrade options—such as improved RF systems and chromaticity correction—are under active development.
- Simulations indicate that the upgraded SPS can achieve the required beam parameters, but performance depends on final design choices.
- Remaining decisions include the selection of specific hardware solutions and integration strategies for the full upgrade.
- The paper establishes a roadmap for SPS upgrades, with performance estimates based on current knowledge and simulation data.
Read this paper