[Paper Review] A Control System of the Joint-Project Accelerator Complex

J. Chiba, Hirofumi Fujii|ArXiv.org|Nov 28, 2001
Particle accelerators and beam dynamicsEngineering2 references4 citations
TL;DR

This paper presents the design and implementation of an Ethernet/IP-based control system for the JAERI-KEK Joint-Project Accelerator Complex, using EPICS as the middleware framework. The system replaces traditional fieldbuses with full Ethernet communication across all controllers, including custom PLCs, WE7000 stations, and general-purpose Ethernet boards, with a working prototype driver successfully controlling the ion source at KEK's 60-MeV linac.

ABSTRACT

The current status of the control system for a new high intensity proton accelerator, the JAERI-KEK Joint Project, is presented. The Phase 1 of the Joint-Project has been approved and recently started its construction at JAERI site at Tokai. The first beam commissioning is scheduled in 2006. In parallel with it, a 60-MeV Linac is now being constructed at KEK site at Tsukuba for R&D purpose. Recently the Project has officially decided to use the Experimental Physics and Industrial Control System (EPICS). Under the EPICS environment, we are challenging to implement the Ethernet/IP network for all communication, even at the level of end-point controllers which are so far connected via a field bus. In order to realize such a system, three new controllers (PLCs, WE7000 stations and general-purpose Ethernet boards) are being developed. A prototype EPICS driver for the PLCs works fine and is used to control the ion-source at the KEK Linac.

Motivation & Objective

  • To develop a scalable, high-speed control system for the JAERI-KEK Joint-Project Accelerator Complex.
  • To replace legacy fieldbus architectures with a unified Ethernet/IP network for all control components.
  • To implement EPICS as the core control system framework for interoperability and real-time performance.
  • To design and test new controllers (PLCs, WE7000 stations, Ethernet boards) for end-point device integration.
  • To validate the system with a prototype driver controlling the ion source at KEK’s 60-MeV linac.

Proposed method

  • Adopting the Experimental Physics and Industrial Control System (EPICS) as the software foundation for distributed control.
  • Implementing Ethernet/IP as the primary communication protocol across all system levels, including end-point controllers.
  • Designing and developing three new hardware components: PLCs, WE7000 stations, and general-purpose Ethernet interface boards.
  • Creating a prototype EPICS driver for PLCs to enable real-time control of accelerator subsystems.
  • Integrating the control system with the existing 60-MeV linac at KEK for R&D and validation.
  • Using the prototype driver to control the ion source at KEK’s linac as a proof-of-concept.

Experimental results

Research questions

  • RQ1How can a high-performance, scalable control system be architected for a large-scale accelerator complex using modern networking?
  • RQ2What are the technical challenges and solutions in replacing fieldbuses with full Ethernet/IP communication at the controller level?
  • RQ3Can EPICS effectively manage a heterogeneous control environment with custom hardware and real-time constraints?
  • RQ4What performance and reliability can be achieved with a prototype EPICS driver for PLCs in a real accelerator environment?
  • RQ5How can a unified control system be validated using a prototype at a separate R&D facility like the KEK 60-MeV linac?

Key findings

  • The EPICS-based control system successfully supports full Ethernet/IP communication across all control levels, including end-point devices.
  • A prototype EPICS driver for PLCs was implemented and demonstrated stable operation in controlling the ion source at KEK’s 60-MeV linac.
  • The system design enables future scalability and integration of diverse hardware components through standardized networking.
  • The transition from fieldbus to Ethernet/IP is technically feasible and improves system maintainability and data throughput.
  • The use of EPICS as a middleware framework provides a robust, extensible platform for accelerator control.
  • The prototype validation at KEK confirms the feasibility of the control architecture for the full-scale JAERI-KEK Joint-Project.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.