[Paper Review] A Critical Path Approach to Analyzing Parallelism of Algorithmic Variants. Application to Cholesky Inversion

Henricus Bouwmeester, Julien Langou|arXiv (Cornell University)|Oct 11, 2010
Matrix Theory and AlgorithmsComputer Science5 references9 citations
TL;DR

This paper introduces a critical path analysis framework to evaluate and compare algorithmic variants of tiled Cholesky inversion on multicore architectures, using both task count and flop-based weights. It demonstrates that the variant with the shortest critical path (Variant 3) achieves the best performance, validated through experiments on a 48-core system, establishing critical path length as a superior metric to total flops for predicting scalability in multicore environments.

ABSTRACT

Algorithms come with multiple variants which are obtained by changing the mathematical approach from which the algorithm is derived. These variants offer a wide spectrum of performance when implemented on a multicore platform and we seek to understand these differences in performances from a theoretical point of view. To that aim, we derive and present the critical path lengths of each algorithmic variant for our application problem which enables us to determine a lower bound on the time to solution. This metric provides an intuitive grasp of the performance of a variant and we present numerical experiments to validate the tightness of our lower bounds on practical applications. Our case study is the Cholesky inversion and its use in computing the inverse of a symmetric positive definite matrix.

Motivation & Objective

  • To understand performance differences among algorithmic variants of tiled Cholesky inversion on multicore platforms.
  • To establish critical path length as a more relevant performance metric than total flops in multicore architectures.
  • To provide theoretical lower bounds on time-to-solution using critical path analysis.
  • To validate the tightness of these bounds through numerical experiments on a 48-core system.
  • To guide the selection of optimal algorithmic variants for dynamic scheduling in tiled linear algebra.

Proposed method

  • Models Cholesky inversion as a directed acyclic graph (DAG) of tasks, with dependencies representing data flow.
  • Assigns task weights either uniformly or based on computational cost (in flops), using b³/3 as a unit to simplify weights.
  • Computes critical path length in terms of both number of tasks and total flops for each algorithmic variant.
  • Applies dynamic scheduling to tile-based algorithms (TILE_POTRF, TILE_TRTRI, TILE_LAUUM) using BLAS/LAPACK kernels.
  • Compares in-place and out-of-place variants to assess overhead and scalability.
  • Derives theoretical upper bounds on performance and validates them against experimental results on a 48-core machine.

Experimental results

Research questions

  • RQ1Which algorithmic variant of tiled Cholesky inversion exhibits the shortest critical path length under flop-based weighting?
  • RQ2How does the critical path length correlate with actual performance on a multicore platform?
  • RQ3To what extent do in-place and out-of-place implementations affect critical path length and performance?
  • RQ4Can critical path length serve as a reliable predictor of scalability in dynamic scheduling environments?
  • RQ5Why does Variant 3 of TILE_TRTRI outperform other variants despite similar total flops?

Key findings

  • Variant 3 of TILE_TRTRI has the shortest flop-based critical path length, explaining its superior performance in experiments.
  • The critical path length metric correlates strongly with observed performance, with experimental results closely matching theoretical upper bounds.
  • Out-of-place variants introduce overhead, but only Variant 1 benefits from a shorter critical path due to buffer usage, which is not observed in Variants 2 and 3.
  • Performance bounds derived from critical path analysis are tightest when the number of threads is small or very large, with moderate discrepancies in the middle range.
  • The critical path length is a better predictor of scalability than total flops, especially in multicore systems where task-level parallelism is constrained by sequential dependencies.
  • The PLASMA software release for SC 2010 will include the Cholesky inversion implementation from this study.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.