[Paper Review] An Upgrade Path for the Fermilab Accelerator Complex

R. Ainsworth, J. Dey|arXiv (Cornell University)|Jun 3, 2021
Particle accelerators and beam dynamicsEngineering10 citations
TL;DR

This paper proposes a comprehensive upgrade path for the Fermilab accelerator complex to increase beam power for the DUNE/LBNF neutrino program from 1.2 MW to 2.4 MW, replacing the aging Booster synchrotron with a new 2 GeV rapid-cycling synchrotron (RCS) and upgrading the PIP-II linac to 2 GeV. The plan enables higher-intensity operations, supports future 4 MW upgrades, and opens new opportunities for low- and intermediate-energy physics experiments.

ABSTRACT

The completion of the PIP-II project and its superconducting linear accelerator will provide up to 1.2 MW of beam power to the LBNF/DUNE facility for neutrino physics. It will also be able to produce high-power beams directly from the linac that can be used for lower-energy particle physics experiments as well, such as directing beam toward the Muon Campus at Fermilab for example. Any further significant upgrade of the beam power to DUNE, however, will be impeded by the limitations of the present Booster synchrotron at the facility. To increase the power to DUNE by a factor of two would require a new accelerator arrangement to feed the Main Injector that does not include the Booster. In what follows, a path toward upgrading the Fermilab accelerator complex to bring the beam power for DUNE to 2.4 MW is presented, using a new rapid-cycling synchrotron plus an energy upgrade to the PIP-II linac. The path includes the ability to instigate a new lower-energy, very high-power beam delivery system for experiments that can address much of the science program presented by the Booster Replacement Science Working Group. It also allows for the future possibility to go beyond 2.4 MW up to roughly 4 MW from the Main Injector.

Motivation & Objective

  • Address the fundamental bottleneck in increasing beam power for the DUNE/LBNF neutrino program beyond 1.2 MW due to limitations of the existing Fermilab Booster synchrotron.
  • Enable a 2.4 MW beam power upgrade to the Main Injector by replacing the Booster with a new rapid-cycling synchrotron (RCS) and upgrading the PIP-II linac to 2 GeV energy.
  • Support a broad portfolio of low- and intermediate-energy physics experiments by enabling MW-class beam delivery at ~2 GeV and ~8 GeV energies in parallel with the Main Injector program.
  • Ensure compatibility with future upgrades up to ~4 MW by optimizing the RCS and MI for higher repetition rates and improved RF performance.
  • Maintain flexibility for long-term scientific advancement by aligning accelerator design with evolving R&D in accelerator science and technology.

Proposed method

  • Replace the Fermilab Booster with a new 2 GeV rapid-cycling synchrotron (RCS) to deliver high-intensity proton beams directly to the Main Injector.
  • Upgrade the PIP-II superconducting linac from 0.8 GeV to 2.0 GeV to reduce space-charge effects during injection into the RCS and improve beam quality.
  • Extend the PIP-II linac tunnel by ~400 ft to accommodate the energy upgrade without requiring a new environmental assessment.
  • Implement a progressive, pulsed-only mode for the energy upgrade to reduce costs and allow staged deployment.
  • Enhance the Main Injector RF system with additional stations (up to 33 cavities) to support a 600 GeV/sec acceleration rate, requiring ~7.5 MV total RF voltage.
  • Optimize the RCS lattice and injection scheme to support high-intensity operation and enable future upgrades to 4 MW via increased ramp rate and improved RF performance.

Experimental results

Research questions

  • RQ1What is the optimal accelerator configuration to increase beam power for DUNE/LBNF from 1.2 MW to 2.4 MW, given the limitations of the current Booster synchrotron?
  • RQ2How can the PIP-II linac be upgraded to 2 GeV to improve beam quality and reduce space-charge effects for injection into a new RCS?
  • RQ3What are the technical and operational requirements for a new rapid-cycling synchrotron to support 2.4 MW beam power and future 4 MW operation?
  • RQ4How can the Main Injector RF system be upgraded to sustain higher beam intensities and faster cycle times?
  • RQ5What is the feasibility of enabling simultaneous high-power beam delivery at low (2 GeV) and intermediate (8 GeV) energies for diverse physics experiments?

Key findings

  • The proposed upgrade path enables a 2.4 MW beam power upgrade to the Main Injector by replacing the Fermilab Booster with a new 2 GeV rapid-cycling synchrotron (RCS).
  • The PIP-II linac can be upgraded to 2.0 GeV with a 400 ft tunnel extension, allowing for a progressive, cost-effective deployment without a new environmental assessment.
  • The new RCS design supports injection of up to 1.85×10^14 protons per second at 600 GeV/sec, requiring a total RF voltage of 7.5 MV across 31–33 cavities.
  • The upgrade path is compatible with a future 4 MW beam power upgrade through increased Main Injector ramp rate and improved RF performance.
  • The new accelerator configuration supports simultaneous high-power beam delivery at ~2 GeV and ~8 GeV, enabling a broad portfolio of low- and intermediate-energy physics experiments.
  • The Recycler Ring is likely to be retired due to the higher intensity and repetition rate of the new RCS, which eliminates the need for slip stacking.

Read this paper