Skip to main content
QUICK REVIEW

[Paper Review] Analysis and Stabilization of AC Line Synchronized Timing System for SuperKEKB

Di Wang, K. Furukawa|arXiv (Cornell University)|May 19, 2021
Particle accelerators and beam dynamicsEngineering18 references1 citations
TL;DR

This paper presents a stabilized AC line-synchronized timing system for SuperKEKB's LINAC, using an AC50 regulator to mitigate timing jitter caused by grid frequency fluctuations. By implementing adaptive sequence shifting with 8/9-pulse mode and drift compensation, the system reduces beam aborts and maintains sub-30 ps timing jitter despite strong AC drifts up to ±158 µs, significantly improving operational stability and beam quality.

ABSTRACT

A timing system provides high-precision signals to allow the controls over a variety of hardware and software components in the accelerator complex. This is guaranteed by the radio frequency (RF) and trigger signal synchronization for subsystems such as klystrons, pulsed magnets, and beam monitors. The main trigger signal should be distributed throughout the facility and repeated at the beam repetition rate. This trigger signal is usually generated by the same phase of an AC power line to follow the source of the fluctuation of an electrical grid and reduce the unwanted variation of the beam quality. To fulfill the needs of the multi-accelerator facility at KEK, apart from the normal trigger synchronization and bucket selection injection control, a beam operation scheme called the pulse-to-pulse modulation is utilized; hence, the complexity of the timing system increases. Uncertainty in the system and a trigger signal delivery error caused by a drastic AC power line drift are observed. Further, the effort to establish a reliable timing system at KEK and several solutions to improve the system robustness are presented.

Motivation & Objective

  • To address timing system instability caused by AC power line frequency drift in SuperKEKB's LINAC.
  • To reduce beam aborts and improve beam quality by stabilizing the timing system under fluctuating grid conditions.
  • To develop and validate a robust sequence shift algorithm that adapts to AC50 drift for reliable pulse-to-pulse modulation.
  • To enable stable operation under AC50-dependent mode while minimizing beam quality degradation.

Proposed method

  • Design and deployment of an AC50 regulator module to stabilize the 50 Hz AC line reference signal.
  • Implementation of a dual-mode timing system: AC50-independent and AC50-dependent operation with automatic switching.
  • Adoption of an 8/9-pulse injection sequence to improve response speed and reduce sequence shift failure risk.
  • Development of a drift-compensated sequence shift algorithm using average AC50 drift from recent pulses for improved timing estimation.
  • Use of TDC measurements and simulations to validate system performance under extreme AC50 drift conditions.
  • Integration of phase-locked loop (PLL) circuits and event-based timing systems with optical fiber distribution for RF and trigger synchronization.

Experimental results

Research questions

  • RQ1How does AC power line frequency drift impact timing jitter and beam quality in SuperKEKB's LINAC timing system?
  • RQ2What are the failure mechanisms of the existing sequence shift algorithm under strong AC50 fluctuations?
  • RQ3Can an AC50 regulator module effectively stabilize the timing system and reduce beam aborts during grid instability?
  • RQ4How does the 8/9-pulse sequence improve robustness compared to the 16/18-pulse sequence under AC50 drift?
  • RQ5To what extent can a drift-compensated sequence shift algorithm handle extreme AC50 drifts?

Key findings

  • The AC50 regulator module stabilizes the 50 Hz reference signal within ±0.04 ms, ensuring reliable timing signal generation.
  • The average transition time from asynchronous to synchronous mode after strong AC drift is ~31 seconds, with resynchronization taking ~20 seconds.
  • The 8/9-pulse sequence reduces timing failure risk compared to the 16/18-pulse sequence due to faster response and shorter sequence length.
  • The improved sequence shift algorithm with AC50 drift compensation can handle drifts ranging from -156 µs to 158 µs, as validated by simulation.
  • A timing failure caused by a 120 µs AC50 drift lasting several seconds was successfully mitigated using the new algorithm.
  • The 8/9-pulse sequence with drift compensation is scheduled for deployment in 2021 summer, demonstrating practical feasibility.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.